Zadnja obnova stikališča 110kV v RTP Selce, je bila v letih 1979 do 1987, Naprave so tehnološko že precej zastarele, celotno stikališče pa je bilo zasnovano v petdesetih letih prejšnjega stoletja glede na takratne potrebe. Dandanes pa obratovalno težko izpolnjuje zahteve v elektroenergetskem sistemu Slovenije. V diplomskem delu je predstavljeno sedanje stanje stikališča 110kV RTP Selce, opisane so naprave ki trenutno obratujejo (zbiralke, odklopniki, ločilniki). Opisani so vzroki za prenovo stikališča in cilji rekonstrukcije, opisano je potrebno dimenzioniranje naprav in izbira samih naprav GIS postroja ter predstavitev le-teh.

Keywords

razdelilna transformatorska postaja;elektroenergetski sistem;stikališče;zbiralke;odklopniki;ločilniki;dimenzioniranje naprav;GIS;

Data

Language: Slovenian
Year of publishing:
Source: Krško
Typology: 2.11 - Undergraduate Thesis
Organization: UM FE - Faculty of Energetics
Publisher: [S. Cizerle]
UDC: 621.316.574(043.2)
COBISS: 1024109148 Link will open in a new window
Views: 3011
Downloads: 321
Average score: 0 (0 votes)
Metadata: JSON JSON-RDF JSON-LD TURTLE N-TRIPLES XML RDFA MICRODATA DC-XML DC-RDF RDF

Other data

Secondary language: English
Secondary title: Reconstruction of 110 kV substation Selce and transition from overhead to GIS substation
Secondary abstract: The last reconstruction of 110 kV substation Selce was carried out in the period from 1979 to 1987. Entire substation was designed in the fifties of last century according to the needs of that time and is today consequently faced with difficulties in meeting operational requirements in the electricity system of Slovenia. The thesis presents the current condition of 110 kV substation Selce, describes currently operating devices (busbars, circuit breakers, disconnectors). It also describes and explains the reasons for and the goals of its planned reconstruction and contains a description of dimensioning of the neccessary devices and selection of GIS unit devices and their introduction.
Secondary keywords: distribution transformer substation;electrical power network;switchgear;busbars;circuit breakers;disconnectors;dimensioning of switchgear;GIS;gas insulated switchgear;
URN: URN:SI:UM:
Type (COBISS): Bachelor thesis/paper
Thesis comment: Dipl. delo, Univ. Maribor, Fakulteta za energetiko
Pages: IX, 53 f.
Keywords (UDC): applied sciences;medicine;technology;uporabne znanosti;medicina;tehnika;engineering;technology in general;inženirstvo;tehnologija na splošno;mechanical engineering in general;nuclear technology;electrical engineering;machinery;strojništvo;electrical engineering;elektrotehnika;
ID: 1003078
Recommended works:
, diplomsko delo visokošolskega strokovnega študijskega programa 1. stopnje
, diplomsko delo visokošolskega strokovnega študijskega programa Energetika
, diplomsko delo visokošolskega strokovnega študijskega programa 1. stopnje
, diplomsko delo univerzitetnega študijskega programa
, diplomsko delo visokošolskega strokovnega študijskega programa 1. stopnje