magistrsko delo magistrskega študijskega programa II. stopnje Strojništvo
Abstract
V okviru magistrskega dela smo v podjetju analizirali obstoječe stanje spremljanja proizvodnje in možnosti za zajem podatkov. Čas, ki ga zaposleni porabi za delo na posamezni operaciji, se beleži ročno najprej na liste, potem pa jih vodja vnese v poslovni informacijski sistem. Raziskali smo različne načine zajema podatkov v proizvodnjah in analizirali možnost njihove vpeljave v obravnavano podjetje. Zajeti podatki so osnova za spremljanje skupne učinkovitosti opreme v proizvodnem procesu. Analizirali smo obstoječi sistem merjenja učinkovitosti znotraj koncerna in ga prilagodili tako, da ustreza potrebam podjetja. Iz rezultatov je razvidno, da bo novo vpeljani informacijski sistem za spremljanje proizvodnje omogočal zajem ustreznih in točnih podatkov, ki bodo verodostojna osnova za nadaljnje analize, vrednotenja in pomembnejše odločitve na višjih ravneh odločanja v podjetju.
Keywords
magistrska dela;spremljanje proizvodnje;učinkovitost opreme;doseganje normativa;zajem podatkov;potek projekta;
Data
Language: |
Slovenian |
Year of publishing: |
2018 |
Typology: |
2.09 - Master's Thesis |
Organization: |
UL FS - Faculty of Mechanical Engineering |
Publisher: |
[M. Jančar Cafuta] |
UDC: |
005:658.5(043.2) |
COBISS: |
16132379
|
Views: |
1467 |
Downloads: |
405 |
Average score: |
0 (0 votes) |
Metadata: |
|
Other data
Secondary language: |
English |
Secondary title: |
OEE implementation in a production company |
Secondary abstract: |
Within the framework of this Master thesis, we have analyzed the existing state of production monitoring in the company and options for data capture. Time needed for operation completing, is captured manually on a piece of paper and later entered in ERP system. We investigated various ways of data capturing in the production and analyzed the possibility of their introduction into the company. The captured data are the basis for OEE monitoring. We analyzed the existing performance measurement system OEE inside the concern and adjusted it to suit the needs of the company. The result shows that the newly introduced information system for production monitoring will enable the collection of relevant and accurate data, which will be the credible basis for further analyzes, evaluations and important decisions at higher levels of decision making in the company. |
Secondary keywords: |
master thesis;production monitoring;equipment efficiency;achieving normative;data recording;project work; |
Type (COBISS): |
Master's thesis/paper |
Study programme: |
0 |
Embargo end date (OpenAIRE): |
1970-01-01 |
Thesis comment: |
Univ. v Ljubljani, Fak. za strojništvo |
Pages: |
XXII, 64 str. |
ID: |
10942522 |