diplomsko delo
Nejc Potočnik (Author), Mirko Ficko (Mentor), Boštjan Razboršek (Co-mentor)

Abstract

V diplomski nalogi je predstavljen proces razvoja in izdelave prednje traktorske hidravlike za traktor Zetor 7341 super turbo. V diplomski nalogi so opisane osnove prednjih traktorskih hidravlik. Nato je predstavljen potek izdelave konstrukcije, ki vključuje iskanje informacij, snovanje sestavnih delov, podsklopov ter sklopa konstrukcije ter izdelave tehnologije od izdelave delovnega naloga, na katerem so napisane operacije laserskega razreza, upogibanja pločevine, rezkanja, struženja ter vrtanja. Vsaka izmed tehnologij je tudi splošno predstavljena. Predstavljen je tudi preračun hidravličnih cilindrov. Rezultati prikazujejo oceno končne izdelave ter ovire in dodatne aktivnosti, ki bi bile potrebne, za serijsko izdelavo prednjih traktorskih hidravlik.

Keywords

prednja hidravlika;CNC;konstrukcija;diplomske naloge;

Data

Language: Slovenian
Year of publishing:
Typology: 2.11 - Undergraduate Thesis
Organization: UM FS - Faculty of Mechanical Engineering
Publisher: [N. Potočnik]
UDC: 656.137:62-233.147(043.2)
COBISS: 21855510 Link will open in a new window
Views: 1098
Downloads: 268
Average score: 0 (0 votes)
Metadata: JSON JSON-RDF JSON-LD TURTLE N-TRIPLES XML RDFA MICRODATA DC-XML DC-RDF RDF

Other data

Secondary language: English
Secondary title: Development and manufacturing of front tractor linkage
Secondary abstract: In the thesis the process of developing and conducting the front linkage for Zetor 7341 Super Turbo tractor is presented. First, the fundamentals of front tractor hydraulics are described. Then the construction process is explained, including information seeking, the formation of basic parts, subassemblies and construction assembly, as well as the development of technology, starting with the work order, where laser cut, sheet metal bending, turning, milling and drilling operations are detailed. Each of the technologies is also broadly described, followed by the presentation of hydraulic cylinder calculation. The results reveal the final production assessment, as well as the obstacles and additional activities, necessary for the serial production of front tractor hydraulics.
Secondary keywords: front linkage;construction;
URN: URN:SI:UM:
Type (COBISS): Bachelor thesis/paper
Thesis comment: Univ. v Mariboru, Fak. za strojništvo, Proizvodne tehnologije in sistemi
Pages: IX, 28 f., [1] zganj. pril. z načrti
ID: 10956911