diplomsko delo Visokošolskega strokovnega študijskega programa I. stopnje Strojništvo
Domen Škrbina (Author), Janez Kušar (Mentor), Tomaž Berlec (Co-mentor)

Abstract

V diplomskem delu je obravnavan problem ugotavljanja učinkovitosti delovnih sredstev v individualni proizvodnji. Za izračun učinkovitosti delovnih sredstev smo uporabili metodo skupne učinkovitosti opreme - OEE. Za pridobitev pravilnih podatkov smo v informacijskem sistemu MES vpeljali modul za spremljanje zastojev ter primerjali normirane čase z dejansko porabljenimi časi za izvedbo delovnih operacij. S pridobljenimi podatki smo izračunali skupno učinkovitost opreme - OEE ter pripadajoče kazalnike. Ugotovili smo, da je planirana zasedenost delovnih sredstev mnogo večja, kot pa je dejanska učinkovitost delovnih sredstev. Na koncu smo podali še predlog za izboljšanje beleženja zastojev ter tudi predloge za večjo učinkovitost delovnih sredstev

Keywords

diplomske naloge;spremljanje proizvodnje;OEE;normirani časi;doseganje norme;zastoji na delovnem sredstvu;

Data

Language: Slovenian
Year of publishing:
Typology: 2.11 - Undergraduate Thesis
Organization: UL FS - Faculty of Mechanical Engineering
Publisher: [D. Škrbina]
UDC: 658.511.5(043.2)
COBISS: 16410395 Link will open in a new window
Views: 1831
Downloads: 420
Average score: 0 (0 votes)
Metadata: JSON JSON-RDF JSON-LD TURTLE N-TRIPLES XML RDFA MICRODATA DC-XML DC-RDF RDF

Other data

Secondary language: English
Secondary title: Overall equipment efficiency
Secondary abstract: The diploma thesis discusses the problem of assessing the efficiency of work centers in an individual production. To calculate the efficiency of the work centers we used a method of overall equipment efficiency - OEE. In order to get the correct data, we introduced in the information system MES a module for recording the downtimes and compared the normative times with the actually time, used for the execution of the work operations. With the acquired data we calculated the collective efficiency of the equipment - OEE and corresponding indicators. We found out that the planned occupancy of the work centers is much higher than the actual efficiency of the work centers. At the end we also offered a proposition for the improvement of recording the downtimes and for better efficiency of the work centers.
Secondary keywords: production monitoring;OEE;normative times;normative achivement;workcenter downtimes;
Type (COBISS): Bachelor thesis/paper
Study programme: 0
Embargo end date (OpenAIRE): 1970-01-01
Thesis comment: Univ. v Ljubljani, Fak. za strojništvo
Pages: XXII, 51 str.
ID: 10958893
Recommended works:
, diplomsko delo Visokošolskega strokovnega študijskega programa I. stopnje Strojništvo
, no subtitle data available
, magistrsko delo magistrskega študijskega programa II. stopnje Strojništvo
, diplomsko delo visokošolskega študijskega programa
, zaključna naloga Univerzitetnega študijskega programa I. stopnje Strojništvo - Razvojno raziskovalni program