diplomska naloga
Jernej Gortnar (Author), Žiga Turk (Mentor), Robert Klinc (Co-mentor)

Abstract

V diplomski nalogi opisujemo računalniška orodja za planiranje gradnje v okolju BIM. Izbrali in pregledali smo tri programe: Navisworks Manage, Bexel Manager in Synchro Pro. Naloga opisuje nadgradnjo 3D BIM-modela v 4D in primerjavo razlik v postopku nadgradnje. V nalogi ovrednotimo programsko opremo glede na kriterije dostopnosti in 4D-sposobnosti. Podana je ugotovitev o razdelanosti BIM-modela, ki je potrebna za 4D-plan in kasneje za spremljanje gradnje. Govori tudi, ali je smiselno BIM 4D-model izdelati med fazo projektiranja. Na koncu ugotovimo, da je najbolj primerno orodje za planiranje gradnje Bexel Manager, da je razdelanost modela LOD 300 dovolj za spremljanje gradnje in da izdelava 4D BIM-modela ni potrebna v fazi projektiranja.

Keywords

gradbeništvo;diplomska naloga;VSŠ;OG-MK;BIM 4D-model;Navisworks Manage;Bexel Manager;Synchro Pro;terminski plan;nadgradnja 3D-modela;

Data

Language: Slovenian
Year of publishing:
Typology: 2.11 - Undergraduate Thesis
Organization: UL FGG - Faculty of Civil and Geodetic Engineering
Publisher: [J. Gortnar]
UDC: 004:699.86(043.2)
COBISS: 8534881 Link will open in a new window
Views: 1265
Downloads: 507
Average score: 0 (0 votes)
Metadata: JSON JSON-RDF JSON-LD TURTLE N-TRIPLES XML RDFA MICRODATA DC-XML DC-RDF RDF

Other data

Secondary language: English
Secondary title: Construction planning in BIM environment
Secondary abstract: In the thesis we review software for construction planning in BIM design environment. We reviewed three programs: Navisworks Manage, Bexel Manager and Synchro Pro. The thesis describes experiences with the upgrade of a 3D BIM-model to 4D and compares differences in the upgrade processes. The thesis also evaluates the software on the criteria of availability of the program and of its 4D-capabilities. It estimates the level of development of a BIM-model, which is needed to 4D-plan and later monitor the construction on-site. It discusses if it is worthwhile to create BIM 4D-model in phase of design. It was found out that the most suitable software for construction planning is Bexel Manager; that LOD 300 is enough to monitor the construction and that the making a 4D BIM-model is not needed in the design phase.
Secondary keywords: civil engineering;graduation thesis;BIM 4D-model;Navisworks Manage;Bexel Manager;Synchro Pro;project plan;upgrade of 3D-model;
Type (COBISS): Bachelor thesis/paper
Study programme: 0
Embargo end date (OpenAIRE): 1970-01-01
Thesis comment: Univ. v Ljubljani, Fak. za gradbeništvo in geodezijo
Pages: XVI, 37 str.
ID: 10959937