diplomsko delo Visokošolskega strokovnega študijskega programa I. stopnje Strojništvo
Abstract
V diplomskem delu obravnavamo razvoj nove mehanske črpalke. Z vidika projekta zajema načrtovanje, organizacijo, vodenje, kontrolo. Pri projektu je želeni cilj izdelek, pot za dosego rezultatov ni poznana oziroma se lahko razlikuje. Pot za razvoj nove črpalke v našem primeru je bila tudi odvisna od trenutnega stanja in zmožnosti podjetja. Projekt je zajemal celoten postopek od ideje, načrtovanja do izdelave prototipa, celotne serije in kontrole. Pri projektu smo se lotili identificiranja tveganj in jih s preventivnimi ukrepi poskušali minimizirati. Predvsem na področju tveganj v procesu proizvodnje smo začeli izvajati kratke sestanke, interno izobraževanje delavcev o izdelavi novih izdelkov, dodali smo tudi vmesno kontrolo. Poudarek pri razvoju je bil predvsem na podnožju črpalke in na pomožni ročici, saj črpalke za avtomobil CV2 s pomožno ročico še ni na trgu. Po izdelavi črpalk je bila zelo pomembna tudi kontrola. Črpalke smo testirali pri različnih pogojih in z različnimi sestavnimi deli, tukaj je pomembna predvsem vzmet krožnika zaradi pravega pritiska in posledično pretoka črpalke.
Keywords
diplomske naloge;projekt;mehanska črpalka;razvoj;načrtovanje;vodenje;
Data
Language: |
Slovenian |
Year of publishing: |
2019 |
Typology: |
2.11 - Undergraduate Thesis |
Organization: |
UL FS - Faculty of Mechanical Engineering |
Publisher: |
[M. Zajc] |
UDC: |
621.176:658.5(043.2) |
COBISS: |
16529691
|
Views: |
893 |
Downloads: |
210 |
Average score: |
0 (0 votes) |
Metadata: |
|
Other data
Secondary language: |
English |
Secondary title: |
The project of developing the mechanical pump |
Secondary abstract: |
In this diploma we are talking about the development of the new mechanical pump. In order to develop the new pump we have to plan, organize, lead and control. The main goal of the project is the finished product. There are many different ways of how this can be achieved. The way that we achieved the development of the new pump depended on the current state and capability of our company. The project encompassed the entire procedure, first there was an idea, then the planning and developing of the prototype, the whole series and at last the control. We introduced a series of precautionary sanctions, which are used to reduce the risks. The risks that are connected with the production were given further attention. We started carrying out short meetings, internally educating the workers about the production of the new products, we also added intermediate control. The emphasis in the development of the pump was on the base of the pump and on the subsidiary handle. Thatʼs because the pump for the CV2 automobile with the subsidiary handle isnʼt on the market yet. The control was also highly important in the production of the product. The pumps were tested in different conditions, with different components. The most important was the spring of the plate because of the right pressure and the flow of the pump. |
Secondary keywords: |
project;mechanical pump;development;planning;leadership; |
Type (COBISS): |
Bachelor thesis/paper |
Study programme: |
0 |
Embargo end date (OpenAIRE): |
1970-01-01 |
Thesis comment: |
Univ. v Ljubljani, Fak. za strojništvo |
Pages: |
XXIV, 62 str. |
ID: |
11061065 |