diplomsko delo
Abstract
Diplomsko delo se osredotoča na dejanski primer sanacije rastlinske čistilne naprave v kraju Motovilci. Predstavljen bo nastanek odpadnih vod, njihove značilnosti in čiščenje le-teh. Podrobno bom predstavil tudi delovanje rastlinske čistilne naprave v odvisnosti od toka vode skozi njih ter bolj podrobno horizontalni, vertikalni ter kombinirani sistem podpovršinskega toka vode, ki se nanaša na dejanski primer nadgradnje horizontalnega toka z vertikalnim na rastlinski čistilni napravi Motovilci. V sami sanaciji si bomo ogledali problematiko dosedanjega stanja in rešitve, vezane na kanalizacijsko omrežje, kot tudi samo rastlinsko čistilno napravo. S slikovnim gradivom bomo dodobra prikazali način gradnje grede z vertikalnim tokom, z rezultati prvih meritev pa izsledke sposobnosti sanirane rastlinske čistilne naprave.
Keywords
odpadne vode;čiščenje odpadne vode;horizontalni tok;vertikalni tok;prve meritve;diplomske naloge;
Data
Language: |
Slovenian |
Year of publishing: |
2019 |
Typology: |
2.11 - Undergraduate Thesis |
Organization: |
UM FGPA - Faculty of Civil Engineering, Transportation Engineering and Architecture |
Publisher: |
[J. Volf] |
UDC: |
626:628.32(043.2) |
COBISS: |
22621462
|
Views: |
776 |
Downloads: |
80 |
Average score: |
0 (0 votes) |
Metadata: |
|
Other data
Secondary language: |
English |
Secondary title: |
Sanation of constructed wetland waste water treatment plant Motovilci |
Secondary abstract: |
The diploma focuses on the factual case of remediating the constructed wetland for waste water treatment in Motovilci, Slovenia. The production of waste water, its characteristics and the procedure of purifying it, is the core focus in the presentation. The operation of the constructed wetland is presented independently of the flow of water passing through the treatment facility. The horizontal, vertical and combined subsurface flow system described, refers to the upgrade of the horizontal and vertical system flow of the constructed wetland in question. In the remediation process, the challenges in the current state and the solutions connected to the sewage system are examined along with the entire constructed wetland as a whole. Using visual material, we demonstrate how to construct a vertical flow bed. The results of the initial measurements, the findings of the performance, pre and post the sanation of the constructed wetland are to be presented in the final case study. |
Secondary keywords: |
waste water;waste water purification;horizontal flow;vertical flow;first measurements; |
Type (COBISS): |
Bachelor thesis/paper |
Thesis comment: |
Univ. v Mariboru, Fak. za gradbeništvo, prometno inženirstvo in arhitekturo, Gradbeništvo |
Pages: |
IX, 42 str., [28] f. pril. |
ID: |
11162047 |