diplomska naloga
Jani Cerar (Author), Aleksander Srdič (Mentor)

Abstract

Vsa večja gradbena podjetja z namenom konkurenčnosti že nekaj let uvajajo in razvijajo procese digitalizacije. Njihov cilj je predvsem povečanje učinkovitosti vodenja investicije v vseh fazah gradnje. Tako kot se projekt deli na različne faze, lahko temeljno področje projektnega vodenja razdelimo na štiri modele (model objekta, model proizvodnje, model poteka ter model tveganj). Za vse te modele mora digitalizacija ponuditi ustrezno rešitev in jo znati pravilno povezati med seboj. To je vse prej kot enostavna naloga še posebej takrat, ko se zavedamo raznolikosti projektov in različne stopnje usposobljenosti posameznih deležnikov, ki pri tem sodelujejo. Ključnega pomena je torej zavedanje vodstva in lastnikov podjetij o nujnosti sprejemanja vizije in prvin 4. industrijske revolucije. Da pa bo v prihodnosti digitalizacija ena izmed ključnih prvin v gradbeništvu ni več vprašanje, težava nastopi le v načinu kako se digitalizacije lotiti.

Keywords

gradbeništvo;diplomska naloga;VSŠ;OG-MO;BIM;IFC;model proizvodnje;popis;ponudba;količine;kalkulacija;viri;tehnologija;terminski plan;stroški gradnje;

Data

Language: Slovenian
Year of publishing:
Typology: 2.11 - Undergraduate Thesis
Organization: UL FGG - Faculty of Civil and Geodetic Engineering
Publisher: [J. Cerar]
UDC: 69.05(043.2)
COBISS: 8843361 Link will open in a new window
Views: 746
Downloads: 304
Average score: 0 (0 votes)
Metadata: JSON JSON-RDF JSON-LD TURTLE N-TRIPLES XML RDFA MICRODATA DC-XML DC-RDF RDF

Other data

Secondary language: English
Secondary title: Manufacturing a model of construction on the basis of the IFC model building
Secondary abstract: For the past several years, all major construction companies have been introducing and developing digitization processes for the sake of competitiveness. Their goal is above all to increase the efficiency of investment management in all stages of construction. Just as the project is divided into different phases, the core area of project management can be divided into four models (object model, production model, schedule model and model of risks). For all these models, digitization must offer an appropriate solution and be able to connect it correctly. This is not a simple task, especially when we are aware of the diversity of projects and the different levels of competence of individual stakeholders involved. Therefore, the awareness of management and business owners about the importance of adopting the vision and elements of the 4th Industrial Revolution is of key importance. However, in the future, digitalization will be one of the key elements in the construction industry, the problem remains providing of digitalisation.
Secondary keywords: civil engineering;graduation thesis;BIM;IFC;production model;inventory;offer;calculation;quantities;resources;technology;timetable;construction costs;
Type (COBISS): Bachelor thesis/paper
Study programme: 0
Embargo end date (OpenAIRE): 1970-01-01
Thesis comment: Univ. v Ljubljani, Fak. za gradbeništvo in geodezijo
Pages: XVI, 48 str.
ID: 11162465