diplomsko delo Visokošolskega strokovnega študijskega programa I. stopnje Strojništvo
Abstract
Podjetje, ki proizvaja modularne objekte, se srečuje s prostorsko stisko in slabo razporeditvijo delovnih mest na treh različnih lokacijah, zato so stroški transporta med posameznimi lokacijami veliki. Podjetje se je odločilo za združitev proizvodnih procesov na eni lokaciji, za kar pa potrebuje optimizacijo delovnih mest in preračun rentabilnosti investicije. S pomočjo Schmigallove modificirane trikotne metode smo določili suboptimalno postavitev delovnih mest, za optimizacijo delovnih mest pa smo izbrali reprezentativni izdelek in mu določili materialne tokove. V nadaljevanju smo izdelali razporeditev novega stanja in ga umestili v novi proizvodni obrat. Ocenili smo nove razdalje transportnih poti in stroške ter jih primerjali z obstoječimi. Spoznali smo, da s suboptimalno postavitvijo delovnih mest dosegamo bistvene spremembe na področju dolžine transportnih poti in stroškov, ki nastanejo pri transportu. Izdelali smo tudi preračun rentabilnosti in gospodarnosti in ocenili, da je investicija rentabilna in gospodarna.
Keywords
diplomske naloge;razmestitev delovnih mest;materialni tok;Schmigallova modificirana trikotna metoda;stroški transporta;rentabilnost;
Data
Language: |
Slovenian |
Year of publishing: |
2019 |
Typology: |
2.11 - Undergraduate Thesis |
Organization: |
UL FS - Faculty of Mechanical Engineering |
Publisher: |
[J. Strniša] |
UDC: |
005.951:658.5(043.2) |
COBISS: |
16900635
|
Views: |
1056 |
Downloads: |
310 |
Average score: |
0 (0 votes) |
Metadata: |
|
Other data
Secondary language: |
English |
Secondary title: |
Positioning of posts in a new production plant |
Secondary abstract: |
A company that produces modular buildings encounters spatial distress and poor job allocation in three different locations, so transport costs are high. The company decided to merge production processes into one location, which requires optimization of jobs and a calculation of the profitability of the investment. With the help of Schmigall's modified triangular method, we established a suboptimal positioning. For the optimization of jobs, we selected a representative product and determined the material flows for it. Then we have made a distribution of the new condition and placed it in the new production plant. Then we have assessed the new distances of transport routes and costs and compared them with existing ones. We realized that with suboptimal job placement, we made significant changes in the area of transport routes and the costs involved in transport. We also made a calculation of profitability and economy and estimated that the investment is profitable and economical. |
Secondary keywords: |
layout;material flow;Schmigall's modified triangular method;transport costs;profitability; |
Type (COBISS): |
Bachelor thesis/paper |
Study programme: |
0 |
Embargo end date (OpenAIRE): |
1970-01-01 |
Thesis comment: |
Univ. v Ljubljani, Fak. za strojništvo |
Pages: |
XXIV, 71 str. |
ID: |
11217192 |