diplomsko delo [visokošolskega strokovnega študijskega programa]
Abstract
V diplomskem delu smo predstavili podjetje SIJ Metal Ravne, d. o. o. V podjetju smo se osredotočili na delo v oddelku interne logistike. V delu smo predstavili obstoječe stanje v interni logistiki, največje probleme v trenutnem sistemu in predlagali določene rešitve.
V prvem delu smo predstavili teoretične osnove in obstoječe stanje v podjetju, v nadaljevanju pa naredili kritično analizo opisanega stanja. V drugem delu dela smo za ugotovljen problem predstavili možne rešitve, na koncu pa povzeli vse ugotovitve, do katerih smo prišli, med pisanjem diplomskega dela. Ocenili in ovrednotili smo uspešnost rešitve samega problema, podali tudi pogoje, ki so potrebni, za uveljavitev rešitve. V zadnjem poglavju smo navedli možnosti za nadaljnji razvoj. Predstavili smo tudi načrt uvedbe, enega izmed sistemov, ter opisali težave pri pridobivanju podatkov za izračun povrnitve stroškov.
Keywords
proizvodna podjetja;planiranje;notranji transport;kritična analiza;prenova;intralogistika;SIJ Metal Ravne;
Data
Language: |
Slovenian |
Year of publishing: |
2018 |
Typology: |
2.11 - Undergraduate Thesis |
Organization: |
UM FL - Faculty of Logistics |
Publisher: |
[J. Močivnik] |
UDC: |
656 |
COBISS: |
513056317
|
Views: |
566 |
Downloads: |
81 |
Average score: |
0 (0 votes) |
Metadata: |
|
Other data
Secondary language: |
English |
Secondary title: |
Renovation of internal transportation in company sij metal ravne d.o.o. |
Secondary abstract: |
We presented the company SIJ Metal Ravne, d. o. o. in the thesis. The focus was on the internal logistics department.In the thesis we presented current conditions in internal logistics, the biggest problems in current system and proposed certain solutions.
The theoretical background and current conditions in the company were presented in the first part, followed by critical analysis of described conditions. In the second part we presented possible solutions of found problems. At the end we summarized all findings that appeared during the work. We evaluated and estimated the success rate of solution and described conditions needed to put solution into effect. The possibilities for further development are described in the last part. We also presented the plan to implement one of the systems and described problems with acquiring information needed for return of cost calculation. |
Secondary keywords: |
production companies;planning;internal transport;critical analysis;renovation;intralogistics; |
Type (COBISS): |
Bachelor thesis/paper |
Thesis comment: |
Univ. v Mariboru, Fak. za logistiko |
Pages: |
VIII, 47 str., [1] str. pril. |
ID: |
11231485 |