diplomsko delo
Alex Radovanovič (Author), Janez Rošer (Mentor), Bojan Lajlar (Co-mentor)

Abstract

V diplomski nalogi je opisano projektiranje odkopavanja premogovega sloja v Premogovniku Velenje. Navedena in opisana so izhodišča, ki jih zahteva Zakon o rudarstvu (ZRud-1-UPB3), ki je pravna in strokovna podlaga za izdelavo rudarskega projekta. V omenjenem zakonu so med drugim navedeni tudi pogoji, ki jih morata izpolnjevati fizična in pravna oseba pri izdelavi projekta. Pri vsakem rudarskem projektu moramo slediti tudi zahtevam, ki jih določa interni pravilnik Premogovnika Velenje o načinu izdelave, zaporedju del, vsebini in reviziji rudarskega projekta. Skladno s tem pravilnikom se vsak rudarski projekt deli na tri dele, in sicer: splošni del, tehnični del in ekonomski del. V pravilniku je določena in precizirana vsebina rudarskega projekta in postopek revidiranja. Vsebina rudarskega projekta mora biti v skladu z zahtevani, ki ga določa Poslovnik o projektiranju in reviziji rudarskih projektov, pridobivanju dovoljenj ter spremni dokumentaciji. V diplomski nalogi sem obdelal tehnični del rudarskega projekta, ki zajema opis projektiranja pripravskih delovišč, tehnologije odkopavanja na odkopu, prezračevanje pripravskih delovišč in etaže, transport materiala in premoga, varnostne predpise, načrt obrambe in reševanja, geomehanski del in vplive na površje.

Keywords

Zakon o rudarstvu;Premogovnik Velenje;rudarsko projektiranje;

Data

Language: Slovenian
Year of publishing:
Typology: 2.11 - Undergraduate Thesis
Organization: UL NTF - Faculty of Natural Sciences and Engineering
Publisher: [A. Radovanovič]
UDC: 622
COBISS: 1844319 Link will open in a new window
Views: 861
Downloads: 268
Average score: 0 (0 votes)
Metadata: JSON JSON-RDF JSON-LD TURTLE N-TRIPLES XML RDFA MICRODATA DC-XML DC-RDF RDF

Other data

Secondary language: English
Secondary title: designing coal layer excavation
Secondary abstract: The diploma thesis describes the design of the coal seam excavation at the Velenje Coal Mine. The starting points required by the Mining Act (ZRud-1-UPB3), which is the legal and professional basis for the preparation of the mining project, are listed and described. The aforementioned Act also states, among other things, the conditions that must be met by a natural and legal person when designing a project. For each mining project, we also have to follow the requirements laid down in the internal rules of the Velenje Coal Mine regarding the method of production, sequence of works, content and audit of the mining project. In accordance with these rules, each mining project is divided into three parts, namely the general part, the technical part and the economic part. The policy sets out and specifies the content of the mining project and the audit process. The content of a mining project must be in accordance with the requirements laid down in the Rules of Procedure for the Design and Review of Mining Projects, Licensing and Supporting Documents. In my thesis I elaborated the technical part of the mining project, which includes the description of the design of the preparation sites, the technology of excavation at the excavation, ventilation of the preparation sites and floors, transportation of materials and coal, safety regulations, defense and rescue plan, geomechanical part and impacts on the surface.
Secondary keywords: Mining act;Velenje Coal Mine;mine design;
Type (COBISS): Bachelor thesis/paper
Study programme: 0
Embargo end date (OpenAIRE): 1970-01-01
Thesis comment: Univ. v Ljubljani, Naravoslovnotehniška fak. , Odd. za geotehnologijo, rudarstvo in okolje
Pages: XI, 45 f.
ID: 11234971