diplomsko delo
Blaž Vodončnik (Author), Matjaž P. Nekrep (Mentor), Janja Kramer Stajnko (Co-mentor)

Abstract

Diplomsko delo opisuje čistilno napravo Loke pri Mozirju, ki je bila zgrajena leta 1991, leta 2016 pa je bila zaradi premajhnih kapacitet narejena njena rekonstrukcija. Pred obnovo je čistilna naprava delovala na potopnike ali biodiske, sedaj pa obratuje s tehnologijo biološkega čiščenja z mehanskim vpihavanjem zraka in dodatnimi nosilci biomase. Na začetku diplomskega dela je podana teorija odvajanja odpadnih voda, nato so opisani lastnosti in vzorčenje ter vrste čiščenja odpadnih voda. Na koncu dela sta opisani obe tehnologiji čiščenja odpadnih voda, in sicer pred in po rekonstrukciji čistilne naprave Loke pri Mozirju.

Keywords

odvajanje odpadnih voda;čistilna naprava;rotirajoči biološki kontaktorji;biološko čiščenje odpadne vode;diplomske naloge;

Data

Language: Slovenian
Year of publishing:
Typology: 2.11 - Undergraduate Thesis
Organization: UM FGPA - Faculty of Civil Engineering, Transportation Engineering and Architecture
Publisher: [B. Vodončnik]
UDC: 696.135:628.32(043.2)
COBISS: 19429123 Link will open in a new window
Views: 919
Downloads: 105
Average score: 0 (0 votes)
Metadata: JSON JSON-RDF JSON-LD TURTLE N-TRIPLES XML RDFA MICRODATA DC-XML DC-RDF RDF

Other data

Secondary language: English
Secondary title: Reconstruction wastewater treatment plant Mozirje
Secondary abstract: The BA thesis describes the wastewater treatment plant in Loke near Mozirje, which was built in 1991 and reconstructed in 2016 after its capacity had become insufficient. The plant was a rotating biological contractor (RBC) system prior to the renovation, but is now based on biological cleaning with mechanical aeration and added biomass carriers. The thesis presents in the first part the theoretical aspects of wastewater discharge, and then describes the characteristics and sampling of wastewater, as well as different types of wastewater treatment. It concludes with a description of both wastewater treatment technologies used in the Loke plant, before and after the reconstruction.
Secondary keywords: wastewater discharge;wastewater treatment plant;rotating biological contractor;biological cleaning;
Type (COBISS): Bachelor thesis/paper
Thesis comment: Univ. v Mariboru, Fak. za gradbeništvo, prometno inženirstvo in arhitekturo, Gradbeništvo
Pages: VIII, 49 str.
ID: 11406678
Recommended works:
, diplomsko delo visokošolskega študijskega programa
, diplomsko delo visokošolskega strokovnega študijskega programa I. stopnje