diplomska naloga
Luka Žižmond (Author), Aleksander Srdič (Mentor)

Abstract

Vsak gradbeni projekt je unikaten. Pri vsakem projektu sodelujejo številni udeleženci, ki med seboj usklajujejo bolj ali manj povezane dejavnosti. Rezultat in uspeh projekta sta v veliki meri odvisna od dobrega in uspešnega sodelovanja vseh akterjev, čar poteka pa je v tem, da se projekt nikoli ne ponovi pod enakimi pogoji. Za kvalitetno izvedbo projekta in predvsem izvedbo v roku so potrebni dobra priprava, usklajevanje ter ustrezno usposobljeni ljudje. Zaradi velike možnosti pojava nepredvidenih dogodkov je treba pred začetkom izvedbe imeti dobro in skrbno pripravljen plan dela, saj lahko le tako hitro in uspešno rešujemo nastale situacije. V diplomskem delu je najprej predstavljen projekt, pri katerem sem sodeloval tudi sam. Gre za rekonstrukcijo dela ceste, katere namena sta izboljšanje protipoplavne varnosti ter ureditev novih komunalnih vodov. Na podlagi pridobljenega gradiva % gradbenega dnevnika, pogodbenega predračuna, knjige obračunskih izmer in terminskega plana % sem natančno predstavil ključne podrobnosti projekta. V nadaljevanju sem naredil analizo s stroškovnega ter časovnega vidika. Za potrebe stroškovne analize sem v programu Excel primerjal vrednosti pogodbenega predračuna s končnim obračunom ter prikazal in opisal vsa odstopanja. Za potrebe časovne analize sem v programu Microsoft Project primerjal prvotno izdelan plan, rebalans plana ter dejanski potek del. Nastale zamike in zamude tekom gradnje sem opisal in obrazložil v stroškovni analizi, kjer so utemeljeni vzroki nastanka le-teh.

Keywords

gradbeništvo;diplomska naloga;VSŠ;GR;GR-OG;analiza poteka izvedbe del;rekonstrukcija cestnega odseka;pritisk svežega betona;stroškovna in časovna analiza;terminski plan;

Data

Language: Slovenian
Year of publishing:
Typology: 2.11 - Undergraduate Thesis
Organization: UL FGG - Faculty of Civil and Geodetic Engineering
Publisher: [L. Žižmond]
UDC: 658.5:69(043.2)
COBISS: 43668227 Link will open in a new window
Views: 458
Downloads: 128
Average score: 0 (0 votes)
Metadata: JSON JSON-RDF JSON-LD TURTLE N-TRIPLES XML RDFA MICRODATA DC-XML DC-RDF RDF

Other data

Secondary language: English
Secondary title: ǂThe ǂanalysis of the implementation of works on the road section reconstruction project
Secondary abstract: Every construction project is unique. Each project involves many participants who coordinate more or less related activities. The result and success of the project largely depend on the great and successful cooperation of all actors, and the charm lies in the fact that the project is never repeated under the same conditions. Good preparation, coordination and suitably qualified people are needed for the quality implementation of the project and especially the implementation within the deadline. Due to the high possibility of unforeseen events, it is necessary to have a well-prepared work plan before the start of the implementation, as this is the only way to resolve the situations that arise quickly and successfully. The diploma work first presents a project that I took part in as well. It is a reconstruction of a part of a road, the purpose of which is to improve flood safety and to arrange new municipal lines. On the basis of the obtained material - construction diary, contract estimate, book of accounting measurements and time plan % I presented the key details of the project in detail. In the following, I made an analysis from a cost and timeframe point of view. For the purposes of cost analysis, I compared the values of the contractual estimate with the final statement in Excel and showed and described all the deviations. For the purposes of time analysis, I compared the originally prepared plan, the rebalance of the plan and the actual course of work in the Microsoft Project program. The resulting delays and delays during construction have been described and explained in the cost analysis, where the causes of these are justified.
Secondary keywords: graduation thesis;civil engineering;analysis of the progress of works;reconstruction of the road section;costal and time analysis;project schedule;
Type (COBISS): Bachelor thesis/paper
Thesis comment: Univ. v Ljubljani, Fak. za gradbeništvo in geodezijo
Pages: IX, 60 str.