diplomsko delo Visokošolskega strokovnega študijskega programa I. stopnje Strojništvo
Abstract
V diplomskem delu je obravnavana ponovna razmestitev proizvodnje notranjih vrat z dodatnimi proizvodnimi površinami. Na začetku smo predstavili teoretične osnove in uporabljene metode. To so analiza toka vrednosti, Schmigallova metoda, metoda zamenjave parov in računalniška simulacija Tecnomatix plant simulation. Z njihovo pomočjo smo ovrednotili obstoječe stanje, ga prerazporedili in mu dodali nova vzporedna delovna mesta. Dobljeno stanje smo ponovno analizirali in ugotovili 68-odstotno zmanjšanje stroškov transporta, kar je bilo izračunano s pomočjo metode izmenjave parov. Poleg tega smo dosegli 43,43-odstotno skrajšanje pretočnega časa pri minimalnem investiranju, kar je bilo ugotovljeno s pomočjo računalniške simulacije. Dobljeno optimizirano stanje smo umestili v dejanske proizvodne prostore podjetja z metodo Schmigalla, ki smo jo dopolnili z lastno kreativnostjo
Keywords
diplomske naloge;materialni tok;analiza toka vrednosti;Schmigallova metoda;metoda izmenjave parov;stroški notranjega transporta;računalniška simulacija proizvodnje;
Data
Language: |
Slovenian |
Year of publishing: |
2021 |
Typology: |
2.11 - Undergraduate Thesis |
Organization: |
UL FS - Faculty of Mechanical Engineering |
Publisher: |
[J. Urbanija] |
UDC: |
658.51:519.876.5(043.2) |
COBISS: |
64809475
|
Views: |
695 |
Downloads: |
112 |
Average score: |
0 (0 votes) |
Metadata: |
|
Other data
Secondary language: |
English |
Secondary title: |
Design of improved workplace layout and material flows in interior door manufacturing |
Secondary abstract: |
In the bachelor's thesis is discussed reorganisation of interior door manufacturing with additional production areas. In the introductory part, we presented the theoretical bases and methods used. These include value stream mapping, the Schmigalla method, the pairwise exchange method and the Tecnomatix Plant Simulation. With their help, we evaluated the existing situation, reorganised it and added new parallel workplace positions to it. The obtained situation was re-analysed and we established a 68% reduction in transport costs, which was calculated by using the pairwise exchange method. In addition, we achieved a 43.43% reduction in throughput time with minimal investment, which was determined by using a computer simulation. We applied the obtained optimised state to the actual production premises of the company by using the Schmigalla method, which we supplemented with our own creative solutions. |
Secondary keywords: |
thesis;material flow;value stream mapping;Schmigalla method;pairwise exchange method;internal transport costs;computer simulation of production; |
Type (COBISS): |
Bachelor thesis/paper |
Study programme: |
0 |
Embargo end date (OpenAIRE): |
1970-01-01 |
Thesis comment: |
Univ. v Ljubljani, Fak. za strojništvo |
Pages: |
XX, 60 str. |
ID: |
12632281 |