diplomsko delo
Matic Bračič (Author), Zoran Pučko (Mentor), Tomaž Kavnik (Co-mentor)

Abstract

Diplomsko delo zajema 4D in 5D BIM modeliranje objekta viadukt Pesnica, na podlagi že izdelanega 3D BIM modela, v občini Pesnica. Za izdelavo modela smo uporabili programsko orodje Trimble Vico Office. Opisan je postopek izdelave 4D in 5D BIM modeliranja, kjer je končen rezultat časovno in stroškovno ovrednoten objekt z animacijo postopka gradnje. Diplomsko delo je razdeljeno na teoretični in praktični del. V teoretičnem delu so podane osnovne informacije o BIM pristopu pri infrastrukturnih objektih in opis viadukta Pesnica. V praktičnem delu je nazorno prikazan postopek za 4. in 5. polje.

Keywords

gradbeništvo;BIM modeliranje;viadukt;časovna in stroškovna analiza;diplomske naloge;

Data

Language: Slovenian
Year of publishing:
Typology: 2.11 - Undergraduate Thesis
Organization: UM FGPA - Faculty of Civil Engineering, Transportation Engineering and Architecture
Publisher: [M. Bračič]
UDC: 725.95:004.414.23(043.2)
COBISS: 80377091 Link will open in a new window
Views: 649
Downloads: 102
Average score: 0 (0 votes)
Metadata: JSON JSON-RDF JSON-LD TURTLE N-TRIPLES XML RDFA MICRODATA DC-XML DC-RDF RDF

Other data

Secondary language: English
Secondary title: 4D and 5D BIM modeling of the Pesnica viaduct
Secondary abstract: The diploma thesis includes 4D and 5D BIM modeling of the Pesnica viaduct building, based on the already made 3D BIM model, in the municipality of Pesnica. We used the Trimble Vico Office software tool to create the model. The process of making 4D and 5D BIM modeling is described, where the result is a time and cost evaluated object with animation of the construction process. The diploma work is divided into theoretical and practical part. The theoretical part provides basic information on the BIM approach to infrastructure facilities and a description of the Pesnica viaduct. In the practical part, the procedure for the 4th and 5th fields is clearly shown.
Secondary keywords: civil engineering;BIM modeling;viaduct;time and cost analysis;
Type (COBISS): Bachelor thesis/paper
Thesis comment: Univ. v Mariboru, Fak. za gradbeništvo, prometno inženirstvo in arhitekturo, Gradbeništvo
Pages: IX, 46 str.
ID: 13286912