magistrsko delo
Klementina Knez (Author), Stojan Kravanja (Mentor), Tomaž Žula (Co-mentor), Primož Jelušič (Co-mentor)

Abstract

V sklopu magistrskega dela je prikazana zasnova jeklenega mostu s poševnimi kabli dolžine 100 m in glavnega razpona 60 m. Premostitvena konstrukcija je namenjena mešanemu prometu. Na sredini se nahajata 2 pasova, namenjena motornemu prometu, ter na vsaki strani pas za kolesarje in pešce. Izvedena je statična in dinamična analiza za obtežne kombinacije ter nato dimenzioniranje po mejnem stanju nosilnosti in mejnem stanju uporabnosti v skladu z Evrokod standardi. V sklopu dimenzioniranja je izvedena tudi zasnova ter analiza podpornih konstrukcij, kjer je za krajni opornik izbran podporni zid, za temelj pilona pa so uporabljeni piloti.

Keywords

gradbeništvo;most s poševnimi kabli;jeklene konstrukcije;piloti;magistrske naloge;

Data

Language: Slovenian
Year of publishing:
Typology: 2.09 - Master's Thesis
Organization: UM FGPA - Faculty of Civil Engineering, Transportation Engineering and Architecture
Publisher: [K. Knez]
UDC: 624.2.014.2(043.2)
COBISS: 113353731 Link will open in a new window
Views: 143
Downloads: 26
Average score: 0 (0 votes)
Metadata: JSON JSON-RDF JSON-LD TURTLE N-TRIPLES XML RDFA MICRODATA DC-XML DC-RDF RDF

Other data

Secondary language: English
Secondary title: 100 m long steel cable-stayed bridge
Secondary abstract: This Master’s thesis is presenting a design, static and dynamic analyses, and dimensioning of the 100 m long steel cable – stayed bridge with the main span of 60 m. Structure of the bridge is designed in a way to be used for a mixed traffic with two lanes for motor traffic in the middle and one lane for cyclists and pedestrians on each side. Static and dynamic analyses of the cable-stayed bridge were performed for the load combinations in accordance with the Eurocode Standards and afterwards used for dimensioning by considering the ultimate and serviceability limit states. Moreover, design and analysis of supporting structures were also performed as a part of the dimensioning where a supporting wall was chosen as the end support and piles were used as a foundation for the pile.
Secondary keywords: civil engineering;cable stayed bridge;steel structures;piles;
Type (COBISS): Master's thesis/paper
Thesis comment: Univ. v Mariboru, Fak. za gradbeništvo, prometno inženirstvo in arhitekturo, Gradbeništvo
Pages: 1 spletni vir (1 datoteka PDF (XV, 147 f.))
ID: 15194473
Recommended works:
, diplomsko delo univerzitetnega študijskega programa
, projektna naloga univerzitetnega študijskega programa GING - smer gradbeništvo 1. stopnje