magistrsko delo
Timi Bojnec (Author), Iztok Palčič (Mentor), Simona Sternad (Mentor)

Abstract

V modernem času, kjer je glavni namen podjetja maksimirati dobiček, je zelo pomembno imeti minimalne stroški znotraj proizvodnje. Za doseganje teh ciljev je pomembno, da so pretočni časi in stroški transporta med delovnimi mesti oziroma stroji najmanjši. Posledično bodo manjši transportni stroški pomenili večji dobiček na koncu poslovnega leta. Manjši pretočni čas bo omogočal več dokončanih produktov v določenem časovnem obdobju. Prav zaradi tega je pomembno, da so proizvodni viri pozicionirani na najbolj optimalen način. Da bi prišli do optimalne razvrstitve proizvodnih virov, smo v magistrskem delu razvili računalniško podprto rešitev za izris diagrama toka obdelovancev iz matrike OD-KAM.

Keywords

diagram toka obdelovancev;matrika OD-KAM;optimalna razvrstitev proizvodnih virov;pretočni čas;transportni strošek;magistrske naloge;

Data

Language: Slovenian
Year of publishing:
Typology: 2.09 - Master's Thesis
Organization: UM FS - Faculty of Mechanical Engineering
Publisher: [T. Bojnec]
UDC: 658.512-027.44(043.2)
COBISS: 151452931 Link will open in a new window
Views: 179
Downloads: 27
Average score: 0 (0 votes)
Metadata: JSON JSON-RDF JSON-LD TURTLE N-TRIPLES XML RDFA MICRODATA DC-XML DC-RDF RDF

Other data

Secondary language: English
Secondary title: Computer-Aided support in production system design
Secondary abstract: In modern times, where the main purpose of the company is to maximize profit, it is very important to have minimal costs within production. In order to achieve these goals, it is important that the flow times and transport costs between workplaces and machines are kept to a minimum. As a result, lower transport costs will mean higher profits at the end of the financial year. A shorter flow time will mean more finished products in a certain period of time. It is for this very reason that it is important that production resources are positioned in the most optimal way. To find the optimal classification of production resources, in our master's thesis we developed a computer-aided solution for drawing the workpiece flow diagram from the FROM-TO matrix.
Secondary keywords: workpiece flow diagram;FROM-TO matrix;optimal classification of production resources;flow time;transport cost;
Type (COBISS): Master's thesis/paper
Thesis comment: Univ. v Mariboru, Fak. za strojništvo, Gospodarsko inženirstvo
Pages: 1 spletni vir (1 datoteka PDF (IX, 42 f.))
ID: 16258761