Tadej Tasič (Author), Borut Buchmeister (Author), Bojan Ačko (Author)

Abstract

Načrtovanje rokov in zmogljivosti spada v področje vodenja proizvodnje. Terminiranje pomeni razporejanje omejenih virov opravilom v določenem časovnem obdobju. Torej gre za postopek odločanja s ciljem optimizacije enegaali več meril. Splošno obsega grobo (dolgoročno), srednjeročno, in podrobno (kratkoročno) načrtovanje. Zadnjemu dajemo zaradi neposredne povezave z opravilno učinkovitostjo največji pomen. V prispevku so predstavljeni razviti postopki terminiranja: prednostna pravila, omejeno iskanje v snopu in hevristično preiskovanje glede na omejitve. Vse je podkrepljeno s prikazom na primerih.

Keywords

načrtovanje proizvodnih postopkov;deterministično razvrščanje;terminiranje;prednostna pravila;

Data

Language: Slovenian
Year of publishing:
Typology: 1.02 - Review Article
Organization: UM FS - Faculty of Mechanical Engineering
Publisher: Association of Mechanical Engineers and Technicians of Slovenia et al.
UDC: 658.51
COBISS: 12075030 Link will open in a new window
ISSN: 0039-2480
Parent publication: Strojniški vestnik
Views: 1216
Downloads: 37
Average score: 0 (0 votes)
Metadata: JSON JSON-RDF JSON-LD TURTLE N-TRIPLES XML RDFA MICRODATA DC-XML DC-RDF RDF

Other data

Secondary language: English
Secondary title: ǂThe ǂdevelopment of advanced methods for scheduling production processes
Secondary abstract: The planning of dates and capacities belongs to the area of production management. Scheduling represents the allocation of scarce sources to tasks in a definite period of time. So it is about a process of deciding, with the goal of optimization, about one or more criteria. In general it includes rough(long term), medium-term and detailed (short-term) planning. The last ofthese has the greatest importance because of a direct connection with operational effectiveness. Some developed scheduling procedures are presentedin the paper, i. e., the priority (dispatching) rules, the filtered-beam search, and the constraint-guided heuristic search. All this is substantiated with described examples.
Secondary keywords: production process planning;deterministic sequencing;scheduling;priority rules;