Abstract
Načrtovanje rokov in zmogljivosti spada v področje vodenja proizvodnje. Terminiranje pomeni razporejanje omejenih virov opravilom v določenem časovnem obdobju. Torej gre za postopek odločanja s ciljem optimizacije enegaali več meril. Splošno obsega grobo (dolgoročno), srednjeročno, in podrobno (kratkoročno) načrtovanje. Zadnjemu dajemo zaradi neposredne povezave z opravilno učinkovitostjo največji pomen. V prispevku so predstavljeni razviti postopki terminiranja: prednostna pravila, omejeno iskanje v snopu in hevristično preiskovanje glede na omejitve. Vse je podkrepljeno s prikazom na primerih.
Keywords
načrtovanje proizvodnih postopkov;deterministično razvrščanje;terminiranje;prednostna pravila;
Data
| Language: |
Slovenian |
| Year of publishing: |
2007 |
| Typology: |
1.02 - Review Article |
| Organization: |
UM FS - Faculty of Mechanical Engineering |
| Publisher: |
Association of Mechanical Engineers and Technicians of Slovenia et al. |
| UDC: |
658.51 |
| COBISS: |
12075030
|
| ISSN: |
0039-2480 |
| Parent publication: |
Strojniški vestnik
|
| Views: |
1216 |
| Downloads: |
37 |
| Average score: |
0 (0 votes) |
| Metadata: |
|
Other data
| Secondary language: |
English |
| Secondary title: |
ǂThe ǂdevelopment of advanced methods for scheduling production processes |
| Secondary abstract: |
The planning of dates and capacities belongs to the area of production management. Scheduling represents the allocation of scarce sources to tasks in a definite period of time. So it is about a process of deciding, with the goal of optimization, about one or more criteria. In general it includes rough(long term), medium-term and detailed (short-term) planning. The last ofthese has the greatest importance because of a direct connection with operational effectiveness. Some developed scheduling procedures are presentedin the paper, i. e., the priority (dispatching) rules, the filtered-beam search, and the constraint-guided heuristic search. All this is substantiated with described examples. |
| Secondary keywords: |
production process planning;deterministic sequencing;scheduling;priority rules; |
| URN: |
URN:NBN:SI |
| Type (COBISS): |
Not categorized |
| Pages: |
str. 844-857 |
| Volume: |
ǂLetn. ǂ53 |
| Issue: |
ǂšt. ǂ12 |
| Chronology: |
2007 |
| ID: |
1737729 |