diplomsko delo
Abstract
V zaključnem delu smo konstruirali delovni oder za podjetje Dravske elektrarne Maribor. Konstrukcija je nameščena v notranjosti spiralnega ohišja Hidroelektrarne Mariborski otok in služi popravilom in vizualnim pregledom vodilnih in predvodilnih lopatic. Postavitev odra je možna med podaljšanimi revizijami. Delovni oder je v celoti konstruiran po standardu SIST EN 12811, ki predpisuje opremo za začasne gradnje. Za konstrukcijo smo izdelali zahtevnik in tehnično dokumentacijo. Glavni element odra smo numerično preračunali s programom SolidWorks, za preračun smo uporabili metodo končnih elementov. Po analizi največjih napetosti in pomikov smo ugotovili, da konstruiran delovni oder ustreza pogojem zahtevnika in standarda ter ga je možno izdelati.
Keywords
delovni oder;hidroelektrarna;konstruiranje;numerična simulacija;diplomske naloge;
Data
Language: |
Slovenian |
Year of publishing: |
2023 |
Typology: |
2.11 - Undergraduate Thesis |
Organization: |
UM FS - Faculty of Mechanical Engineering |
Publisher: |
[M. Višič] |
UDC: |
62-774.5-11(043.2) |
COBISS: |
186355203
|
Views: |
154 |
Downloads: |
24 |
Average score: |
0 (0 votes) |
Metadata: |
|
Other data
Secondary language: |
English |
Secondary title: |
Construction of a scaffold at a hydroelectric power plant |
Secondary abstract: |
In this final work, we constructed a working scaffold for the company Dravske elektrarne Maribor. The construction is installed inside the spiral housing of the hydroelectric power plant Mariborski otok. The construction is used for repairs and visual inspection on guide vanes and stay vanes, installation of a scaffold is possible during extended audits. The scaffolding is constructed entirely according to the SIST EN 12811 standard, which prescribes equipment for temporary constructions. We created a requirements list and technical documentation for the construction. The main element of the scaffolding was numerically calculated using the SolidWorks program and the finite element method was used for the calculation. After analyzing the maximum stresses and displacements, we concluded that the constructed scaffold meets the requirements of the company and the standard. The construction can be manufactured. |
Secondary keywords: |
scaffold;hydroelectric power plant;construction;numerical simulation;SolidWorks; |
Type (COBISS): |
Bachelor thesis/paper |
Thesis comment: |
Univ. v Mariboru, Fak. za strojništvo, Konstrukterstvo |
Pages: |
1 spletni vir (1 datoteka PDF(X, 34 f. [10] f. pril.)) |
ID: |
19681922 |