diplomska naloga
Jugoslav Kuzmanović (Author), Aleksander Srdič (Mentor), Tomo Cerovšek (Thesis defence commission member), Violeta Bokan-Bosiljkov (Thesis defence commission member)

Abstract

Analiza poteka faze gradnje hotela Cubo

Keywords

gradbeništvo;VSŠ;hotel Cubo;inženiring;vodenje projektov;terminski plan;faze del;

Data

Language: Slovenian
Year of publishing:
Source: Ljubljana
Typology: 2.11 - Undergraduate Thesis
Organization: UL FGG - Faculty of Civil and Geodetic Engineering
Publisher: [J. Kuzmanović]
UDC: 69.008(338.488.2:640.412Cubo)(043.2)
COBISS: 5746529 Link will open in a new window
Views: 2557
Downloads: 1060
Average score: 0 (0 votes)
Metadata: JSON JSON-RDF JSON-LD TURTLE N-TRIPLES XML RDFA MICRODATA DC-XML DC-RDF RDF

Other data

Secondary language: English
Secondary title: Hotel Cubo - construction phase analysis
Secondary abstract: The thesis presents the project of renovation of the object with respect to the planned and actual realisation. All changes in circumstances and conditions during the construction are defined. On the basis of their impact and consequences, the time and financial analysis of the project's success is carried out.
Secondary keywords: graduation thesis;hotel Cubo;engineering;project management;schedule;work stages;
File type: application/pdf
Type (COBISS): Undergraduate thesis
Thesis comment: Univ. v Ljubljani, Fak. za gradbeništvo in geodezijo
Pages: IX, 64 str.
Type (ePrints): thesis
Title (ePrints): Hotel Cubo - Construction Phase Analysis
Keywords (ePrints): Hotel Cubo;inženiring;vodenje projektov;terminski plan;faze del
Keywords (ePrints, secondary language): Hotel Cubo;engineering;project management;schedule;work stages
Abstract (ePrints): V nalogi je predstavljen projekt prenove objekta z vidika planirane in dejanske realizacije. V nalogi so sistematično definirane vse spremembe okoliščin in pogojev med izvedbo. Na osnovi njihovega vpliva in posledic je izvedena časovna in finančna analiza uspešnosti projekta.
Abstract (ePrints, secondary language): The thesis presents the project of renovation of the object with respect to the planned and actual realisation. All changes in circumstances and conditions during the construction are defined. On the basis of their impact and consequences, the time and financial analysis of the project's success is carried out.
Keywords (ePrints, secondary language): Hotel Cubo;engineering;project management;schedule;work stages
ID: 8312300