diplomska naloga
Abstract
V diplomski nalogi obravnavamo proces modeliranja predora z BIM orodji in prikažemo razvoj knjižnic oziroma družin za predore za programsko okolje Revit.
V prvem delu diplomske naloge je predstavljen proces načrtovanja in izvedbe predorov, opisane so različne tehnologije gradnje predorov ter tipična sestava cestnih predorov s poudarkom na Novi avstrijski metodi (NATM). Proces načrtovanja predora je razčlenjen na posamezne faze, pri čemer je podrobneje obravnavana stopnja definiranosti posameznih elementov predora v vsaki fazi.
V drugem delu diplomske naloge je predstavljeno projektiranje z uporabo BIM orodij ter prednosti BIM tehnologije. Navedeni so problemi oziroma posebnosti, s katerimi se srečamo pri modeliranju predora. V nalogi prikazujemo tudi metodologijo izdelave knjižnic za informacijske modelirnike stavb in izdelavo družin ter njihovo uporabo pri modeliranju predora. Na praktičnem primeru je prikazan proces izdelave BIM modela obstoječega
avtocestnega predora Leščevje. Posebno pozornost smo posvetili modeliranju vseh bistvenih elementov, ki sestavljajo predor ter njihovo združevanje v model.
V sklepnem delu smo prestavili možnosti uporabe oblaka točk pri projektiranju ali gradnji predora. V zaključku pa dajemo poudarek tudi na priložnosti, ki jih ponuja uporaba BIM modela predora.
Keywords
gradbeništvo;diplomska dela;UNI;GR;predor;sestava predora;projektiranje;modeliranje;knjižnice;družine;BIM;Revit;
Data
Language: |
Slovenian |
Year of publishing: |
2014 |
Typology: |
2.11 - Undergraduate Thesis |
Organization: |
UL FGG - Faculty of Civil and Geodetic Engineering |
Publisher: |
[S. Saje] |
UDC: |
004:624.19(497.4)(043.2) |
COBISS: |
6814049
|
Views: |
2717 |
Downloads: |
679 |
Average score: |
0 (0 votes) |
Metadata: |
|
Other data
Secondary language: |
English |
Secondary title: |
Tunnel modeling with BIM tools |
Secondary abstract: |
Graduation thesis deals with the process of tunnel modeling with the use of BIM tools and shows the development of libraries and families for tunnels for Revit software environment.
In the first part of the thesis the process of design and construction of tunnels is presented, various tunnel construction methods and typical structure of road tunnels are described with an emphasis on the new Austrian method (NATM). The tunnel design process is broken down into individual phases, while the level of development of all individual tunnel elements in each stage is handled in more detail.
In the second part of the thesis the design using BIM tools and advantages of BIM technology are presented. The problems and particularities that we meet in the process of
tunnel modelling are indicated. In the thesis, the methodology of libraries for building information modeling tools and families creation with their use in tunnel modelling is shown. The practical case of making a BIM model is shown by modeling the existing motorway tunnel Leščevje. Special attention was paid to the modeling of all the essential component elements and their integration in the model.
In the concluding part, the possibilities of the use of point cloud in the design or construction stage of the tunnel are presented. In conclusion, the emphasis is also on the opportunities offered by the use of BIM model of a tunnel. |
Secondary keywords: |
graduation thesis;civil engineering;tunnel, tunnel structure;design;modeling;libraries;families; |
File type: |
application/pdf |
Type (COBISS): |
Bachelor thesis/paper |
Thesis comment: |
Univ. v Ljubljani, Fak. za gradbeništvo in geodezijo |
Pages: |
XII, 41 str., 2 pril. |
ID: |
8708399 |