diplomska naloga
Abstract
V diplomski nalogi sem predstavil geodetska dela pri izgradnji AC priključka Naklo. Opisana so dela pred, med in po izgradnji objekta. V prvem poglavju sem predstavil smernice in načrte nove ureditve priključka na avtocesto ter obseg gradnje AC priključka Naklo. Nadaljeval sem z geodetskimi deli pred gradnjo, ki so potrebni za pripravo dobrega izhodišča za nadaljnja delo med gradnjo. Opisani so vsi postopki, ki so bili opravljeni pred pripravo projekta za gradbeno dovoljenje (PGD) in tudi pred začetkom gradnje. Izdelal se je projekt geodetske mreže, izravnava opazovanj ter geodetski, katastrski in zakoličbeni načrt. Največ diplomske naloge sem posvetil izgradnji samega priključka, kjer sem opisal metode in natančnost zakoličevanja točk ter kronološki potek gradnje. Veliko prostora sem namenil tudi evidentiranju gospodarske javne infrastrukture. V zadnjem poglavju so predstavljena končna geodetska dela, ki sem jih opravil skupaj z geodetskim podjetjem, ki je zaključilo vse postopke gradnje in predajo objekta investitorju. Izdelal se je geodetski načrt za projekt izvedenih del (PID) in elaborati za vpis GJI v uradne evidence.
Keywords
geodezija;diplomska naloga;UNI;AC priključek Naklo;geodetska mreža;metode zakoličevanja;ocena natančnosti;Plateia;evidentiranje GJI;
Data
Language: |
Slovenian |
Year of publishing: |
2014 |
Typology: |
2.11 - Undergraduate Thesis |
Organization: |
UL FGG - Faculty of Civil and Geodetic Engineering |
Publisher: |
[I. Pavc] |
UDC: |
528.3:625.7(497.4)(043.2) |
COBISS: |
6897505
|
Views: |
2352 |
Downloads: |
591 |
Average score: |
0 (0 votes) |
Metadata: |
|
Other data
Secondary language: |
English |
Secondary title: |
Geodetic works on the construction of slip road Naklo |
Secondary abstract: |
In my thesis, I have presented land surveying relating to the construction of the slip road Naklo. These works are described before, during, and after the completion of the project. In the first chapter, I have illustrated guidelines and plans for the new layout of the slip road and the scale of such construction. Following is land surveying before the construction that is necessary for preparing a good starting point for further construction work. I have outlined all procedures necessary before the basic design (PGD) and even before the start of the construction. A design of survey grid was made, also an observation balance, and surveying, cadastral and setting-out design. The majority of my thesis is dedicated to the construction of the slip road wherein I am describing the methods and accuracy of setting out, and chronological order of the road building. A lot of space was allotted to the recording of a public infrastructure (GJI). In the last chapter are presented the final stages of surveying I conducted with the surveying company that brought all construction procedures to a conclusion and handed over
the facility to the investor. Survey design was made for an as-build design (PID) and studies for an entry of GJI in the official records. |
Secondary keywords: |
graduation thesis;geodesy;slip road Naklo;geodetic grid;stake out methods;accuracy assessment;Plateia;public infrastructure; |
File type: |
application/pdf |
Type (COBISS): |
Undergraduate thesis |
Thesis comment: |
Univ. v Ljubljani, Fak. za gradbeništvo in geodezijo |
Pages: |
XII, 76 str., 4 pril. |
ID: |