Language: | Slovenian |
---|---|
Year of publishing: | 2009 |
Typology: | 2.11 - Undergraduate Thesis |
Organization: | UM FGPA - Faculty of Civil Engineering, Transportation Engineering and Architecture |
Publisher: | [V. Golob] |
UDC: | 624.072.3(043.2) |
COBISS: | 12998934 |
Views: | 3488 |
Downloads: | 1864 |
Average score: | 0 (0 votes) |
Metadata: |
Secondary language: | English |
---|---|
Secondary title: | 48 m long composite bridge |
Secondary abstract: | The diploma thesis discusses the steel bridge of 48m length and 10m width. Bridge is constructed of reinforced concrete plate and a different steel profiles. The steel profiles and reinforced concrete plate forms a composite system together with beams. All construction components and junctions/joints are dimensioned according to rules which are defined in European norms – Eurocodes. |
Secondary keywords: | bridge;composite structures;steel structures;construction anaysis;dimension; |
URN: | URN:SI:UM: |
Type (COBISS): | Undergraduate thesis |
Thesis comment: | Univ. v Mariboru, Fak. za gradbeništvo |
Pages: | 143 f., [2] zganj. pril. |
ID: | 8715574 |