Language: | Slovenian |
---|---|
Year of publishing: | 2013 |
Typology: | 2.11 - Undergraduate Thesis |
Organization: | UM FGPA - Faculty of Civil Engineering, Transportation Engineering and Architecture |
Publisher: | [B. Vasiljević] |
UDC: | 694.057+624.011.1(043.2) |
COBISS: | 17784854 |
Views: | 1585 |
Downloads: | 257 |
Average score: | 0 (0 votes) |
Metadata: |
Secondary language: | English |
---|---|
Secondary title: | CONSTRUCTION PROCEDURE OF PASSIVE WOODEN PREFABRICATED HOUSE |
Secondary abstract: | The thesis deals with construction procedure of passive wooden prefabricated houses in the company Rihter prefabricated construction. In the first part there will be presented all the materials used in this type of house and in hereinafter a construction procedure of the third phase of construction. The latter will be presented to all of the structural elements of manufacturing companies in the workshop Rihter prefabricated construction through to installation on site. This will include all labor from the base plate to the layout of the facility and completion of the third phase of construction |
Secondary keywords: | wooden construction;prefabricated construction;low-energy construction;passive house; |
URN: | URN:SI:UM: |
Type (COBISS): | Undergraduate thesis |
Thesis comment: | Univ. v Mariboru, Fak. za gradbeništvo, Gradbeništvo |
Pages: | IV, 73 f. |
ID: | 8727953 |