Language: | Slovenian |
---|---|
Year of publishing: | 2013 |
Typology: | 2.11 - Undergraduate Thesis |
Organization: | UM FGPA - Faculty of Civil Engineering, Transportation Engineering and Architecture |
Publisher: | [A. Panker] |
UDC: | 69:658.8.03(043.2) |
COBISS: | 17898006 |
Views: | 1659 |
Downloads: | 72 |
Average score: | 0 (0 votes) |
Metadata: |
Secondary language: | English |
---|---|
Secondary title: | DETERMINING THE BID PRICE FOR THE BUILT-IN ELEMENTS FOR THE CONSTRUCTION OF CLEAN ROOMS |
Secondary abstract: | Diploma thesis comprises determining the method and calculation of the cost price of the product by: 1) The method of determining the cost price with the factor 2) Method of determining the cost price according to the quantity of product sold The first part presents the clean rooms and where applicable, the organizational structure of the company, the process of manufacturing components for clean rooms, and an analysis of the costs to society for the past year. The second part of the task includes preparing the data for the calculation of the cost price of the product. For the calculation of the two procedures used by means of a factor for indirect costs on the basis of the quantity of items sold. In the final part of the calculations the cost price of the product according to both methods. |
Secondary keywords: | construction;prefabricated construction;the cost price;comparison of methods; |
URN: | URN:SI:UM: |
Type (COBISS): | Undergraduate thesis |
Thesis comment: | Univ. v Mariboru, Fak. za gradbeništvo, Gradbeništvo |
Pages: | [8] f., 71 f. |
ID: | 8728441 |