Language: | Slovenian |
---|---|
Year of publishing: | 2014 |
Typology: | 2.11 - Undergraduate Thesis |
Organization: | UM FERI - Faculty of Electrical Engineering and Computer Science |
Publisher: | [N. Smolar] |
UDC: | 621.311.21;621.313.33(043.2) |
COBISS: | 18436630 |
Views: | 1368 |
Downloads: | 288 |
Average score: | 0 (0 votes) |
Metadata: |
Secondary language: | English |
---|---|
Secondary title: | PLANNING OF THE MICRO HYDRO POWER PLANT WITH INTEGRATED PELTON TURBINE |
Secondary abstract: | The diploma work focuses on the production of electrical energy through the help of a hydroelectric power station. The emphasis is mostly on the area of the turbines with a partial over flow of water - in the studied case this is the Pelton turbine. In the beginning of the thesis the numerical calculations are presented with the dynamical variables of the water flow and losses, for the variable statuses of the turbine's working, or for the different radius of the water power. In the second part we can find the sources and the costs of the build and maintenance of such an investment. The investment is valued based on the static method of cumulative money flow and the dynamic nett method of the current value. |
Secondary keywords: | micro hydro power plant;production of elektrical energy;Pelton turbine;asynchronous generator;economical justification; |
URN: | URN:SI:UM: |
Type (COBISS): | Bachelor thesis/paper |
Thesis comment: | Univ. v Mariboru, Fak. za elektrotehniko, računalništvo in informatiko |
Pages: | XIII, 61 f. |
ID: | 8729980 |