diplomska naloga
Abstract
Na mostovih se z leti uporabe pojavljajo poškodbe in pomankljivosti različnega obsega in z
različnimi vplivi na funkcionalnost ter izgled. Da zagotovimo varnost, uporabnost in tudi estetski
videz, moramo objekte redno strokovno pregledovati in vzdrževati. Nekateri objekti pa se
poškodujejo do te mere, da je potrebno preučiti variantne rešitve. V tej nalogi primerjamo rešitvi
za most čez Ozlenšček v Ozeljanu.
Najprej na podlagi pregleda in preiskav sestavimo popis potrebnih sanacijskih del na objektu,
s katerim izračunamo tudi predvidene stroške celovite sanacije. Te primerjamo z ocenjenimi
stroški nadomestne gradnje objekta. Ugotovimo, da so stroški nadomestne gradnje skoraj 15-
krat večji od stroškov celovite sanacije, zato izberemo sanacijo kot bolj smiselno in gospodarno
rešitev. Poleg cene primerjamo alternativni rešitvi tudi na podlagi drugih kriterijev, kot sta
trajnost in uporabnost.
Keywords
gradbeništvo;diplomska dela;mostovi;sanacija;nadomestna gradnja;primerjava rešitev;
Data
Language: |
Slovenian |
Year of publishing: |
2015 |
Typology: |
2.11 - Undergraduate Thesis |
Organization: |
UL FGG - Faculty of Civil and Geodetic Engineering |
Publisher: |
[A. Petrič] |
UDC: |
624.21:69.059.25(497.4Ozeljan)(043.2) |
COBISS: |
7265121
|
Views: |
1487 |
Downloads: |
342 |
Average score: |
0 (0 votes) |
Metadata: |
|
Other data
Secondary language: |
English |
Secondary title: |
Multi-criteria comparison between optional solutions for the rehabilitation of the bridge over Ozlenšček in Ozeljan |
Secondary abstract: |
During their service life, faults and deficiencies that influece their functionality and appearance
emerge on bridges. In order to ensure safety, usability and aesthetic appearance, structures
have to undergo regular expert review and maintenance. Some bridges are damaged to the
extent where it is necessary to consider alternative solutions. This thesis compares solutions
to the bridge over Ozlenšček in Ozeljan.
In the first step, we compile an inventory of necessary remedial works on the basis of the
examination and tests on the bridge and calculate the estimated costs of comprehensive
rehabilitation. These costs are later compared with estimated costs of the newly constucted
bridge. The results show that the cost of the replacement construction is almost 15 times grater
than the cost of the rehabilitation, therefore we select the latter as a more rational and
economical solution. In addition to the comparison of cost, other criteria such as sustainability
and usability are used. |
Secondary keywords: |
graduation thesis;civil engineering;bridges;rehabilitation;replacement construction;solution comparison; |
File type: |
application/pdf |
Type (COBISS): |
Bachelor thesis/paper |
Thesis comment: |
Univ. v Ljubljani, Fak. za gradbeništvo in geodezijo |
Pages: |
VIII, 16 str., [2] str. pril. |
ID: |
9056121 |