diplomska naloga
Abstract
Skozi življenjsko dobo objektov je treba objekte redno vzdrževati za zagotavljanje neovirane
in varne uporabe objektov. Slabo vzdrževanje objektov lahko pripelje do nastanka večjih
poškodb, ki lahko ogrozijo konstrukcijo. Pri vzdrževanju mostov lahko pride do dileme, ali je
obstoječi objekt bolje sanirati in nadgraditi, ali je bolj smiselno zgraditi nov objekt.
V diplomski nalogi je obravnavan konkreten armirano betonski most, za katerega je bil narejen
popis poškodb. Iz popisanih poškodb je narejen predlog sanacijskih ukrepov v primeru obnove
mostu in pa opis novogradnje mostu. Predstavljena sta popisa stroškov v primeru sanacije in
v primeru novogradnje. Varianti sta primerjani na podlagi cene, varnosti objekta in prometnih
povezav, iz česar je razvidno, da je za določen most bolj smiselna sanacija kot pa novogradnja.
Keywords
gradbeništvo;diplomska dela;most;sanacija;nadomestna gradnja;
Data
Language: |
Slovenian |
Year of publishing: |
2015 |
Typology: |
2.11 - Undergraduate Thesis |
Organization: |
UL FGG - Faculty of Civil and Geodetic Engineering |
Publisher: |
[S. Brzin] |
UDC: |
69.059.25:624.21/.8(043.2) |
COBISS: |
7261537
|
Views: |
1651 |
Downloads: |
526 |
Average score: |
0 (0 votes) |
Metadata: |
|
Other data
Secondary language: |
English |
Secondary title: |
Decision making between renovation and construction: case study of Kokra bridge in Preddvor |
Secondary abstract: |
During their whole lifetime, buildings and other structures have to be maintained regularly in
order to ensure a safe and unrestricted use. Poor maintenance can result in the occurrence of
major damages that could put the construction of the buildings at risk. When it comes to the
maintenance of the bridges, a dilemma may arise, would it be more sensible to renovate and
add to the existing construction or to build a completely new construction.
This paper deals with a certain reinforced concrete bridge for which a damage report has been
made. Based on the report, a proposal of remedial actions in case of a renovation of the bridge
and a description of a complete reconstruction of the bridge have been prepared. Both
alternatives are compared based on the price, safety, and transport links. The comparison
shows that in case of this certain bridge, a renovation is more sensible than a new construction. |
Secondary keywords: |
graduation thesis;civil engineering;bridge;renovation;new construction; |
File type: |
application/pdf |
Type (COBISS): |
Bachelor thesis/paper |
Thesis comment: |
Univ. v Ljubljani, Fak. za gradbeništvo in geodezijo |
Pages: |
IX, 19 str. |
ID: |
9056907 |