diplomsko delo visokošolskega strokovnega študijskega programa
Andrej Lešnik (Author), Nataša Šuman (Mentor), Zoran Pučko (Co-mentor)

Abstract

V diplomskem delu smo predstavili in analizirali zidna sistema proizvajalca Wienerberger Opekarna Ormož d.o.o., in to pri različnih širinah. Obravnavana zidna sistema Porotherm S in Porotherm PROFI imata določeno tehnologijo izvedbe ter vključene elemente. Analizo smo izvedli ob pomoči informacijskega modeliranja stavb (BIM). Izdelali smo dva osnovna 3D-modela nosilnih sten, od katerih ima vsak šest variant modelov nosilnih sten, ki se razlikujejo po debelini zidu, uporabljenem zidnem sistemu in po tem, ali so v zidu odprtine ali ne, ter ju časovno in stroškovno analizirali.

Keywords

zidni sistem;opeka;BIM;stroški gradnje;časovna analiza;diplomske naloge;

Data

Language: Slovenian
Year of publishing:
Typology: 2.11 - Undergraduate Thesis
Organization: UM FGPA - Faculty of Civil Engineering, Transportation Engineering and Architecture
Publisher: [A. Lešnik]
UDC: 692.2:[004:624]+657.478(043.2)
COBISS: 19806998 Link will open in a new window
Views: 1347
Downloads: 158
Average score: 0 (0 votes)
Metadata: JSON JSON-RDF JSON-LD TURTLE N-TRIPLES XML RDFA MICRODATA DC-XML DC-RDF RDF

Other data

Secondary language: English
Secondary title: TIME AND COST ANALYSIS OF BUILDING CONSTRUCTION WITH WIENERBERGER WALL SYSTEMS BY THE SUPPORT OF BIM
Secondary abstract: The thesis presents and analyses two wall systems of different thicknesses of the manufacturer Wienerberger Opekarna Ormož d.o.o. The discussed wall systems Porotherm S and Porotherm PROFI have a specific implementation technology and integrated elements. We performed the analysis with the help of building information modeling (BIM). We developed two basic 3D models of load-bearing walls, of which each has six variants of models of load-bearing walls, which vary according to the thickness of the wall, the used wall system, and whether there are openings in the wall or not. We then performed a time and cost analysis.
Secondary keywords: wall system;bricks;BIM;construction costs;time analysis;
URN: URN:SI:UM:
Type (COBISS): Undergraduate thesis
Thesis comment: Univ. v Mariboru, Fak. za gradbeništvo, prometno inženirstvo in arhitekturo
Pages: VII, 61 f.
ID: 9129795