diplomsko delo visokošolskega študijskega programa
Branko Bohorč (Author), Uroš Klanšek (Mentor), Meta Zajc-Pogorelčnik (Co-mentor)

Abstract

V diplomski nalogi je za objekt medgeneracijski izobraževalni center izdelan projekt organizacije gradbišča in analiziran terminski plan, ki je izdelan v mrežni in gantogramski tehniki. Da se organizacija gradbišča lahko sploh izdela, je potrebno preučiti območje gradnje, funkcionalno zasnovo in tehnične značilnosti objekta. Nato se za potrebe same organizacije gradbišča najprej preuči predhodne pogoje gradnje, ki se nanašajo na razno dokumentacijo, možnosti nabave potrebnih gradbenih materialov in delovnih sredstev. Sledi dimenzioniranje začasnih objektov in inštalacij, ki so za gradbišče nujno potrebni. V zaključku organizacije gradbišča se izdela tehnično poročilo in shema gradbišča, kjer se vidi lokacija začasnih prostorov in deponij. V zaključku diplomskega dela je opisana posamezna faza gradnje ter izdelan mrežni diagram in terminski plan v gantogramski tehniki, ki prikazuje dejanski potek posameznih del ter spremljanje in analizo gradnje objekta do končnega roka.

Keywords

gradbeništvo;gradbena dela;organizacija grajenja;analiza terminskega plana;diplomske naloge;

Data

Language: Slovenian
Year of publishing:
Typology: 2.11 - Undergraduate Thesis
Organization: UM FGPA - Faculty of Civil Engineering, Transportation Engineering and Architecture
Publisher: [B. Bohorč]
UDC: 005.936.2:69.05(043.2)
COBISS: 19656470 Link will open in a new window
Views: 1320
Downloads: 185
Average score: 0 (0 votes)
Metadata: JSON JSON-RDF JSON-LD TURTLE N-TRIPLES XML RDFA MICRODATA DC-XML DC-RDF RDF

Other data

Secondary language: English
Secondary title: THE PROJECT OF ORGANIZATION OF A CONSTRUCTION SITE >INTERGENERATIONAL EDUCATION CENTER MARIBOR< WITH TIME SCHEDULE ANALYSIS
Secondary abstract: This diploma thesis presents the organizational project of the construction site for the Intergenerational educational center building. In addition, the term plan made using network diagram and gantt chart planning technique is analyzed. Before organizing the construction site, preliminary studies of construction area, functionality of the area, and technical characteristics of the building have to be carried out. Preliminary building conditions, related to various documentation, the purchase of necessary building material, and means of work need to be studied. The thesis also deals with the dimensioning of temporary facilities and installations, which are necessary for the construction site. In the final part of the construction site organization, a technical report and a scheme of the construction site with the location of temporary facilities and deposit areas are presented. At the end of the thesis, each individual stage of construction is presented, as well as a network diagram and a gantt chart, showing the actual progress of works along with monitoring and the analysis of the construction until deadline.
Secondary keywords: civil engineering;building works;organization of structure;analysis time schedule;
URN: URN:SI:UM:
Type (COBISS): Undergraduate thesis
Thesis comment: Univ. v Mariboru, Fak. za gradbeništvo, prometno inženirstvo in arhitekturo
Pages: XIII, 170 f.
ID: 9141146