diplomsko delo
Matej Kokol (Author), Jože Pihler (Mentor), Andreja Lutar-Skerbinjek (Mentor)

Abstract

V diplomskem delu je predstavljena možnost izgradnje male hidroelektrarne na izbranem odseku reke Pesnice v občini Gorišnica. Območje gradnje ne spada v ekološko pomembno območje ali v območje naravnih vrednot, tako da za gradnjo na tem območju ne veljajo posebni predpisi, ki bi jih bilo treba upoštevati. Izbrana lokacija leži na območju Zamušanov, kjer je na podlagi vodomerne postaje, ki se nahaja v neposredni bližini, analiziran pretok reke in ekološko sprejemljiv pretok. V nadaljevanju je predstavljena možnost gradnje manjše hidroelektrarne. Na kratko je opisana oprema manjših hidroelektrarn in predstavljena sama tehnična zasnova posameznih objektov. Narejena je tudi kratka primerjava z veliko hidroelektrarno Formin. V zaključku diplomskega dela je izvedena ekonomska analiza, kjer so analizirani investicijski stroški, prihodki iz prodaje električne energije, na koncu pa je izračunan čas, v katerem se bo investicija povrnila.

Keywords

proizvodnja električne energije;gradnja malih hidroelektrarn;male hidroelektrarne;ekonomska analiza;turbine;diplomske naloge;

Data

Language: Slovenian
Year of publishing:
Typology: 2.11 - Undergraduate Thesis
Organization: UM FERI - Faculty of Electrical Engineering and Computer Science
Publisher: M. Kokol
UDC: 621.311.21(043.2)
COBISS: 20296982 Link will open in a new window
Views: 1430
Downloads: 171
Average score: 0 (0 votes)
Metadata: JSON JSON-RDF JSON-LD TURTLE N-TRIPLES XML RDFA MICRODATA DC-XML DC-RDF RDF

Other data

Secondary language: English
Secondary title: A COMPARISON OF THE CONSTRUCTION OF SMALL AND LARGE HYDROELECTRIC POWER PLANT
Secondary abstract: The thesis presents the possibility of building small hydroelectric power plant in the selected section of river Pesnica in municipality of Gorišnica. This site of construction does not fall within any important ecological areas, so the area of construction do not apply to specific special legal regulations that should been followed. Furthermore, the flow of the river and ecologically acceptable flow were analyzed, based on station, located in the immediate vicinity of Zamušani. The possibility of building small hydroelectric power plant was introduced. An equipment of small hydroelectric power plants and their technical scheme was described and a short comparison with large hydroelectric power plant Formin was made. Furthermore, an economic analysis with analysis of the investment costs, revenue from sales of electricity were made and time in which our investment will be repaid was calculated.
Secondary keywords: electricity generation;construction;small hydropower plant;economic analysis;turbines;
URN: URN:SI:UM:
Type (COBISS): Undergraduate thesis
Thesis comment: Univ. v Mariboru, Fak. za elektrotehniko, računalništvo in informatiko, Elektrotehnika, Gospodarsko inženirstvo
Pages: XII, 87 f.