diplomsko delo visokošolskega strokovnega študija Organizacija in management delovnih procesov
Abstract
Vsaka proizvodna enota, ki danes želi uresničevati zahteve po cenovni konkurenčnosti in biti hkrati kapitalsko donosna, mora poskrbeti za nenehno odpravljanje vsakršnih izgub v proizvodnji.
V diplomskem delu je obravnavano reševanje problema povečanega izmeta v realnem okolju proizvodne motorjev DMU. Izmet je lahko posledica različnih vzrokov, zato so v teoretičnem delu naloge predstavljene ugotovitve s področja učinkovitosti proizvodnih procesov in vitke proizvodnje. Opisan je tudi pristop šest sigma in metodologija DMAIC, s katero smo problem reševali.
Diplomsko delo temelji na projektnem pristopu uvajanja metodologije DMAIC v proizvodnjo z namenom zmanjšanja izmeta. V praktičnem delu naloge so predstavljeni posamezni koraki te metodologije, ki so od definiranja problema, opisa začetnega stanja ter izvedenih meritev in analiz pripeljali projektni tim do rešitev, implementacije le teh in obenem zagotovili ohranjanje pridobljenih rezultatov implementiranih izboljšav.
Projektni pristop in metodologija DMAIC sta se izkazala kot učinkovit način za odpravo določenih izgub v proizvodnji in dvig delovne kulture zaposlenih, ki je temelj nadaljnjih nenehnih izboljšav.
Keywords
prenova procesov;metodologija DMAIC;učinkovito vzdrževanje;
Data
Language: |
Slovenian |
Year of publishing: |
2016 |
Typology: |
2.11 - Undergraduate Thesis |
Organization: |
UM FOV - Faculty of Organizational Sciences |
Publisher: |
[B. Kavčič] |
UDC: |
658.5 |
COBISS: |
7708179
|
Views: |
1162 |
Downloads: |
37 |
Average score: |
0 (0 votes) |
Metadata: |
|
Other data
Secondary language: |
English |
Secondary title: |
IMPLEMENTATION OF DMAIC METHOD IN COMPANY ISKRA MEHANIZMI D.O.O. |
Secondary abstract: |
Each production unit that wants to meet the criteria of price competitiveness and simultaneously achieve capital profit in today's business world has to constantly reduce needs in production. The thesis deals with solving the problem of increased rejection rate in a realistic environment of production of DMU. There are many causes that can increase rejection rate, which is why the theoretical part of the thesis includes findings from the area of efficiency and lean production.
The thesis is based on a projection approach to induce the DMAIC methodology into production to reduce the rejection rate. In the practical part of the thesis individual steps leading the team to the solution are displayed. These include: defining the problem, describing the initial state, taking measurements and the analysis that brought the team to the solution, together with their implementation. Keeping the acquired results from the implemented improvements was also assured.
The projection approach and DMAIC methodology have proven to be an efficient way of reducing certain losses in the production and increasing the working culture of the employees, which is the foundation of continuous improvements. |
Secondary keywords: |
process renovation;DMAIC methodology;efficient maintenance;DMU (Drum Motor Unit);small project; |
URN: |
URN:SI:UM: |
Type (COBISS): |
Undergraduate thesis |
Thesis comment: |
Univ. v Mariboru, Fak. za organizacijske vede |
Pages: |
56 f. |
ID: |
9167927 |