magistrsko delo na študijskem programu 2. stopnje UM
Mitja Mulec (Author), Milan Kuhta (Mentor), Aljoša Klobučar (Co-mentor)

Abstract

V magistrski nalogi je prikazan način izdelave informacijskega modela inženirskega objekta – skrajšano BIM. Gre za primer širitve skladiščnega, kontejnerskega terminala pristanišča v Luki Koper. Predstavljene so osnovne definicije pravilnega informacijskega modela in podrobneje razložena njegova izdelava s programom Allplan podjetja Nemetschek. Širitev skladiščnih površin se izvaja na morju, temu primerna je tehnologija gradnje iz montažnih elementov, ki so v kasnejši fazi monolitizirani. V nalogi je podrobneje opisan proces tehnologije gradnje objekta. Izdelan je prenos IFC formata v program SCIA ter izvedena kontrola pretvorbe konstrukcijskega modela v matematični oz. računski model.

Keywords

informacijsko modeliranje;BIM;IFC;Allplan;Scia;Luka Koper;inženirski objekti;tehnologija gradnje;montažni elementi;prednapeti beton;magistrske naloge;

Data

Language: Slovenian
Year of publishing:
Typology: 2.09 - Master's Thesis
Organization: UM FGPA - Faculty of Civil Engineering, Transportation Engineering and Architecture
Publisher: [M. Mulec]
UDC: 624(043.2)
COBISS: 20536598 Link will open in a new window
Views: 1082
Downloads: 205
Average score: 0 (0 votes)
Metadata: JSON JSON-RDF JSON-LD TURTLE N-TRIPLES XML RDFA MICRODATA DC-XML DC-RDF RDF

Other data

Secondary language: English
Secondary title: BUILDING INFORMATION MODELING OF DEPOT AREAS ON THE SEA WITHIN ENLARGEMENT OF PORT OF KOPER
Secondary abstract: This master thesis presents the manner of using Building information modeling of engineering structure – BIM. It is a presentation for depot areas on the sea within the enlargement of Port of Koper. Basic assumptions of appropriate information modeling are presented along with the detailed method of BIM production by using the programme Allplan by manufacturer Nemetschek. Enlargement of depot areas is being built on the sea. The construction technology is suitable with that so it is mix of precast concrete elements which are monolithic with concrete in-situ. In master thesis there is a detailed presentation of building technology. There is a transfer of the IFC format into the programme SCIA, and also there is an implementation of the control of conversion of a construction model into mathematical, calculation model.
Secondary keywords: building information modeling;IFC;Allplan;Scia;Port of Koper;engineering object;construction technology;precast elements;pre-stressed concrete;
URN: URN:SI:UM:
Type (COBISS): Master's thesis/paper
Thesis comment: Univ. v Mariboru, Fak. za gradbeništvo, prometno inženirstvo in arhitekturo
Pages: VIII, 76 str., [6] zganj. pril. načrti
ID: 9199866
Recommended works:
, magistrsko delo na študijskem programu 2. stopnje UM
, magistrsko delo na študijskem programu 2. stopnje
, diplomsko delo visokošolskega strokovnega študijskega programa