diplomska naloga
Martin Čakš (Author), Aleksander Srdič (Mentor)

Abstract

Potek gradnje večjih investicij ne mine brez zapletov. Pogosto nastajajo časovna in stroškovna odstopanja. Še posebej je to občutljiva zadeva, ko se gre za javne investicije. V diplomski nalogi je opisan potek gradnje preko javnega naročila. Začne se splošnim opisom objekta in cilji investicije. Sledi projektantski popis del, na podlagi katerega se pripravi razpisna dokumentacija. Na podlagi ponudb se izbere izvajalca z najcenejšima ponudbama, s katerima se podpiše gradbena pogodba. Že po krajšem času izvedbe del se ugotovi, da bodo potrebna dodatna dela ter, da se bo čas gradnje podaljšal. Sproti so opisani razlogi za sklenitev aneksa. Na koncu je opisana in prikazana primerjava projektantskega predračuna, pogodbene vrednosti del in končne vrednosti del.

Keywords

gradbeništvo;diplomska naloga;OG-MO;rekonstrukcija;javna naročila;časovno odstopanje;stroškovno odstopanje;

Data

Language: Slovenian
Year of publishing:
Typology: 2.11 - Undergraduate Thesis
Organization: UL FGG - Faculty of Civil and Geodetic Engineering
Publisher: [M. Čakš]
UDC: 69.059.7:725.8(497.4Šmarje pri Jelšah) (043.2)
COBISS: 7813217 Link will open in a new window
Views: 1796
Downloads: 682
Average score: 0 (0 votes)
Metadata: JSON JSON-RDF JSON-LD TURTLE N-TRIPLES XML RDFA MICRODATA DC-XML DC-RDF RDF

Other data

Secondary language: English
Secondary title: Analysis of the reconstruction of the Cultural center Šmarje pri Jelšah
Secondary abstract: The course of major investment constructions does not resolve without complications. It often results in time and cost deviations. This is an especially delicate matter when it comes to public investments. This thesis describes the course of construction through public procurement. It starts with a general description of the facility and the objective of the investment, followed by an inventory of planned works on the basis of which the tender ocumentation is prepared. On the basis of the tenders, the contractor with the cheapest offer is selected, followed by the signing of the construction contract. After just a short time of executing construction works it is revealed that additional works will be required and that the construction time will be extended. The reasons for the agreement to the annex are described along the thesis. Finally, the comparisons of the engineering estimate, the contract value and the final value of the works are shown and described.
Secondary keywords: reconstruction;public investment;time discrepancy;cost discrepancy;
File type: application/pdf
Type (COBISS): Bachelor thesis/paper
Thesis comment: Univ. v Ljubljani, Fak. za gradbeništvo in geodezijo