diplomska naloga
Vikica Vasileva (Author), Aleksander Srdič (Mentor), Primož Banovec (Thesis defence commission member), Marijan Žura (Thesis defence commission member), Janko Logar (Thesis defence commission member)

Abstract

V gradbeništvu je bistvo vsega, da se projekt zaključi najkrajšem možnem roku in seveda s čim manjšimi dodatnimi stroški. V tej diplomski nalogi je opisan eden izmed večjih gradbenih projektov na slovenski obali, in sicer izgradnja rezervoarjev za naftne derivate. V diplomski nalogi je analizirano odstopanje pogodbenega terminskega plana in pogodbenega predračuna pri izgradnji rezervoarjev R21, R22 in R23. Natančneje so obravnavane spremembe v projektu, ki so pripeljale do časovnega zamika med gradnjo in nepričakovanimi stroški. Podrobneje je tudi pojasnjena razčlenitev del, saj je na objektu sodelovalo več podizvajalcev, kar je predstavljalo dodatno oviro pri delih. Izgradnja rezervoarjev za naftne derivate je vključevala tudi izgradnjo nekaterih spremljajočih objektov.

Keywords

gradbeništvo;diplomska dela;rezervoarji;terminski plan;analiza;odstopanja;

Data

Language: Slovenian
Year of publishing:
Typology: 2.11 - Undergraduate Thesis
Organization: UL FGG - Faculty of Civil and Geodetic Engineering
Publisher: [V. Vasileva]
UDC: 005.521:69(497.4)(043.2)
COBISS: 7851873 Link will open in a new window
Views: 1928
Downloads: 471
Average score: 0 (0 votes)
Metadata: JSON JSON-RDF JSON-LD TURTLE N-TRIPLES XML RDFA MICRODATA DC-XML DC-RDF RDF

Other data

Secondary language: English
Secondary title: Cost and time analysis of cunstruction of petroleum tanks
Secondary abstract: The point in construction is that the project is completed in shortest possible period of time and, of course with minimal additional costs. In this graduation thesis it`s described one of the major construction projects on the Slovenian coast, namely the construction of tanks for petroleum products. The graduation thesis analyzes the deviation of the vontractual schedule and contractual estimate fot the construction of reservoirs R21, R22 and R23. Changes in the project which led to the time lag between construction and unexpected costs was described in detail, as well as the breakdown of labor, because at the facility involving several subcontractors, which represented additional obstacle in work. The construction of tanks for petroleum products also included the construction of the other supporting facilitiey.
Secondary keywords: graduation thesis;civil engineering;tanks for petroleum;time schedule;analysis;deviations;
File type: application/pdf
Type (COBISS): Undergraduate thesis
Thesis comment: Univ. v Ljubljani, Fak. za gradbeništvo in geodezijo
Pages: XII, 61 str., 2 pril.
ID: 9238388