Language: | Slovenian |
---|---|
Year of publishing: | 2016 |
Typology: | 2.11 - Undergraduate Thesis |
Organization: | UM FERI - Faculty of Electrical Engineering and Computer Science |
Publisher: | [R. Sušek] |
UDC: | 621.311 |
COBISS: | 20405526 |
Views: | 1382 |
Downloads: | 148 |
Average score: | 0 (0 votes) |
Metadata: |
Secondary language: | English |
---|---|
Secondary title: | Calculation of investment in movable hydropower plant with Banki turbine on the old bed of the river Drava |
Secondary abstract: | The project objective is to review the water flow situation in the old bed of the river Drava and find the best possible option for the construction of hydroelectric power plants, with regard to what the market currently offers. Deriving from the best market choice I then calculate the technical and financial side of this hydroelectric power plant plan to determine whether an investment in this hydro power plant on the old bed of the river Drava would be possible and reasonable. |
Secondary keywords: | Movable hydropower plant;old bed of the river Drava;calculation of hydropower plant investment;Banki turbine; |
URN: | URN:SI:UM: |
Type (COBISS): | Diploma project paper |
Thesis comment: | Univ. v Mariboru, Fak. za elektrotehniko, računalništvo in informatiko, Elektrotehnika |
Pages: | V, 28 f. |
ID: | 9576362 |