[projekt]
Rok Sušek (Author), Jože Pihler (Mentor)

Abstract

Cilj projektne naloge je pregledati razmere na stari strugi reke Drave in ugotoviti čim boljšo možnost za gradnjo hidroelektrarne, glede na to kaj tržišče trenutno ponuja. Nato izračunati tehnični in finančni del te hidroelektrarne in ugotoviti ali bi bila investicija v to hidroelektrarno na stari strugi reke Drave upravičena.

Keywords

hidroelektrarne;vodne turbine;Bankijeva turbina;

Data

Language: Slovenian
Year of publishing:
Typology: 2.11 - Undergraduate Thesis
Organization: UM FERI - Faculty of Electrical Engineering and Computer Science
Publisher: [R. Sušek]
UDC: 621.311
COBISS: 20405526 Link will open in a new window
Views: 1382
Downloads: 148
Average score: 0 (0 votes)
Metadata: JSON JSON-RDF JSON-LD TURTLE N-TRIPLES XML RDFA MICRODATA DC-XML DC-RDF RDF

Other data

Secondary language: English
Secondary title: Calculation of investment in movable hydropower plant with Banki turbine on the old bed of the river Drava
Secondary abstract: The project objective is to review the water flow situation in the old bed of the river Drava and find the best possible option for the construction of hydroelectric power plants, with regard to what the market currently offers. Deriving from the best market choice I then calculate the technical and financial side of this hydroelectric power plant plan to determine whether an investment in this hydro power plant on the old bed of the river Drava would be possible and reasonable.
Secondary keywords: Movable hydropower plant;old bed of the river Drava;calculation of hydropower plant investment;Banki turbine;
URN: URN:SI:UM:
Type (COBISS): Diploma project paper
Thesis comment: Univ. v Mariboru, Fak. za elektrotehniko, računalništvo in informatiko, Elektrotehnika
Pages: V, 28 f.
ID: 9576362