diplomsko delo visokošolskega strokovnega študija
Stojan Baumkirher (Author), Drago Vuk (Mentor)

Abstract

Rudarska panoga v Sloveniji je zadnje desetletje zaznamovana s številnimi zapiranji rudnikov. Eden izmed njih je tudi Rudnik Trbovlje — Hrastnik (RTH). Obsega približno 1400 hektarjev površin v občinah Trbovlje in Hrastnik. Razteza se na dolžini 9 kilometrov. Znotraj njega sta še dve aktivni jami, v preteklosti pa se je premog odkopaval tudi na površini. V času zapiranja rudnika so že bila izvedena nekatera dela v zvezi z ekološko in prostorsko sanacijo površine. Jame se zapirajo od vzhoda proti zahodu, zato se bodo v tem vrstnem redu izvajala tudi dokončna sanacijska dela in določile sanacijske faze območij. V diplomski nalogi je opisana vizija glede začasne in dokončne ureditve degradirane površine in problemi, ki se pojavljajo zaradi pomanjkanja prostorskih načrtov. Predstavljeno je tudi načrtovanje bodoče uporabe degradiranih površin po njihovi ekološki in prostorski sanaciji.

Keywords

zapiranje rudnika;odvodnjavanje jamskih objektov;ekološka sanacija;

Data

Language: Slovenian
Year of publishing:
Source: Kranj
Typology: 2.11 - Undergraduate Thesis
Organization: UM FOV - Faculty of Organizational Sciences
Publisher: [S. Baumkirher]
UDC: 622
COBISS: 6590483 Link will open in a new window
Views: 2403
Downloads: 326
Average score: 0 (0 votes)
Metadata: JSON JSON-RDF JSON-LD TURTLE N-TRIPLES XML RDFA MICRODATA DC-XML DC-RDF RDF

Other data

Secondary language: English
Secondary title: CLOSURE OF MINING FACILITIES AND REHABILITATION OF AREAS IN THE COAL MINE AREA RUDNIK TRBOVLJE - HRASTNIK
Secondary abstract: The mining industry in Slovenia is in the last decade marked by the closure of many mines. One of them is Rudnik Trbovlje – Hrastnik (RTH). It covers approximately 1400 hectares in the municipalities Trbovlje and Hrastnik and measures over 9 km in length. At present there are two active pits inside the mine, but in the past the coal was also excavated on the surface. During the closing of the mine some work on the ecological and spatial remediation of the surface has already been carried out. The caves are closing from east to west, and therefore in this order final remediation work will be carried out and remediational area phases established. The thesis describes a vision of the momentary and final arrangements for the degraded surfaces and problems that arise due to the lack of spatial plans. The thesis also presents the planning for the future use of degraded surfaces after their ecological and spatial remediation.
Secondary keywords:  mine closing; dewatering of cave facilities; environmental remediation; spatial remediation; renewable energy sources.;
URN: URN:SI:UM:
Type (COBISS): Undergraduate thesis
Thesis comment: Univ. v Mariboru, Fak. za organizacijske vede
Pages: 42 f.
Keywords (UDC): applied sciences;medicine;technology;uporabne znanosti;medicina;tehnika;engineering;technology in general;inženirstvo;tehnologija na splošno;mining;rudarstvo;rudarska tehnika;rudarska dela;
ID: 988344
Recommended works:
, diplomsko delo visokošolskega strokovnega študija
, diplomsko delo visokošolskega strokovnega študija
, diplomsko delo
, diplomsko delo visokošolskega strokovnega študijskega programa