diplomsko delo
Abstract
S pričetkom veljavnosti Pravilnika o pregledovanju in preizkušanju opreme pod tlakom je aprila 2004 prešla kontrola opreme pod tlakom v obratovanju z državnih organov na Organe za periodične preglede — Kontrolne organe.
Osnovni namen izvajanja periodičnih kontrol je zagotoviti varno obratovanje opreme pod tlakom tekom celotne dobe uporabe. Za izpolnjevanje teh zahtev mora imeti kontrolni organ na razpolago določene prostore in opremo. Razpolagati mora z zadostnim številom osebja, ki mora biti strokovno usposobljeno za izvajanje kontrol. Imeti mora izdelan sistem kakovosti, v katerem so predpisani organizacijski postopki, kontrolni postopki, navodila za delo z opremo ter obrazci za izdajo poročil in potrdil o kontrolah.
Tema diplomske naloge je organizacija kontrolnega organa za kontrolo opreme pod tlakom v skladu z zahtevami zgoraj navedenega pravilnika in standarda SIST EN ISO/IEC 17020:2004.
Keywords
kontrola opreme;sistem kakovosti;kakovost izdelkov;oprema pod tlakom;kontrolni organ;zakonsko meroslovje;
Data
Language: |
Slovenian |
Year of publishing: |
2009 |
Source: |
Maribor |
Typology: |
2.11 - Undergraduate Thesis |
Organization: |
UM FS - Faculty of Mechanical Engineering |
Publisher: |
[D. Vizovišek] |
UDC: |
005.934.2:621.224(043.2) |
COBISS: |
13775894
|
Views: |
2084 |
Downloads: |
192 |
Average score: |
0 (0 votes) |
Metadata: |
|
Other data
Secondary language: |
English |
Secondary title: |
Organization of an inspection body for inspecting pressure equipment |
Secondary abstract: |
With the Regulation on examination and testing of pressure equipment, coming into force in April 2004, the control of pressure equipment in operation passed from national authorities to the Bodies for periodic inspection - the Inspection Body.
The primary purpose of carrying out periodic control is to ensure the safe operation of equipment under pressure during the entire period of use. In order to meet with these requirements, the Inspection Body must have at it’s disposal certain premises and equipment. It must have a sufficient number of qualified staff members to carry out checks. It must have a made out quality system that prescribes: organizational procedures, control procedures, instructions for work with the equipment and forms to issue reports and certificates of controls.
The topic of this diploma work is the organization of the Inspection Body for the inspection of pressure equipment in accordance with the requirements of the above regulations and the standard SIST EN ISO / IEC 17020:2004. |
Secondary keywords: |
inspection;quality;pressure equipment;legal metrology; |
URN: |
URN:SI:UM: |
Type (COBISS): |
Undergraduate thesis |
Thesis comment: |
Univ. v Mariboru, Fak. za strojništvo |
Pages: |
IX, 108 f. |
Keywords (UDC): |
science and knowledge;organization;computer science;information;documentation;librarianship;institutions;publications;znanost in znanje;organizacije;informacije;dokumentacija;bibliotekarstvo;institucije;publikacije;prolegomena;fundamentals of knowledge and culture;propaedeutics;prolegomena;splošne osnove znanosti in kulture;management;menedžment;fields of management;področja menedžmenta;plant management;physical resources management;menedžment obrata;menedžment materialnih virov;applied sciences;medicine;technology;uporabne znanosti;medicina;tehnika;engineering;technology in general;inženirstvo;tehnologija na splošno;mechanical engineering in general;nuclear technology;electrical engineering;machinery;strojništvo;hydraulic energy;water power;hydraulic machinery;hidravlična energija;hidravlični stroji; |
ID: |
988364 |