diplomsko delo
Dejan Čontala (Avtor), Andrej Štrukelj (Mentor), Zoran Pučko (Komentor)

Povzetek

V diplomskem delu smo obravnavali tri variante medetažnih konstrukcij. Vrst stropnih sistemov je dandanes veliko, zato smo izbrali tri najpogostejše variante. Med seboj smo primerjali sistem AB plošče, stropni sistem Porotherm podjetja Wienerberger Opekarna Ormož d.o.o. in stropni sistem Ytong podjetja Xella porobeton SI. Vsak stropni sistem smo podrobneje predstavili, opisali njegovo tehnologijo izvedbe ter izdelali stroškovno in časovno analizo. Pred izvedbo samih analiz smo najprej opisali teoretične osnove stroškovne in časovne analize. V nadaljevanju smo izdelali popis del, predkalkulacije in izvedli kalkulacijo glavne analize cene za enoto mere. S pomočjo glavne analize cene smo izračunali stroške posameznega stropnega sistema. Na podlagi popisa del smo za vsako aktivnost izračunali čas trajanja in tako izvedli časovno analizo s pomočjo programa MS Project. Aktivnostim smo še dodali vire in za vsak stropni sistem izdelali gantogram. Na podlagi pridobljenih rezultatov smo določili stroškovno in časovno najugodnejšo varianto stropnega sistema.

Ključne besede

gradbeništvo;stropni sistemi;stroškovna analiza;časovna analiza;diplomske naloge;

Podatki

Jezik: Slovenski jezik
Leto izida:
Tipologija: 2.11 - Diplomsko delo
Organizacija: UM FGPA - Fakulteta za gradbeništvo, prometno inženirstvo in arhitekturo
Založnik: [D. Čontala]
UDK: 692.54+657.478(043.2)
COBISS: 21972758 Povezava se bo odprla v novem oknu
Št. ogledov: 847
Št. prenosov: 80
Ocena: 0 (0 glasov)
Metapodatki: JSON JSON-RDF JSON-LD TURTLE N-TRIPLES XML RDFA MICRODATA DC-XML DC-RDF RDF

Ostali podatki

Sekundarni jezik: Angleški jezik
Sekundarni naslov: The comparison of floor systems with time and cost analysis
Sekundarni povzetek: In the graduation thesis, we have dealt with three variants of split-level constructions. Nowadays, there are many types of ceiling systems. Thus, we have chosen the three most common variants. We have compared the system of AB plates, ceiling system Porotherm of the company Wienerberger Opekarna Ormož d.o.o., and ceiling system Ytong of the company Xella porobeton SI. Each of the ceiling system has been presented in detail; we have described its implementation technology, and made cost and time analysis. Prior performing analyses, we first described the theoretical basics of cost and time analysis. Further, we have prepared a list of works, pre-calculations, and performed calculation of the main price analysis for the unit of measure. On the basis of the main price analysis, we have calculated costs of individual ceiling system. Based on the list of works, we have calculated duration for each activity and thus implemented time analysis using the MS Project programme. We have added resources to the activities, and created Gantt chart for each ceiling system. Based on the obtained results, we have determined the most favourable variant of the ceiling system regarding costs and time.
Sekundarne ključne besede: civil engineering;floor systems;cost analysis;time analysis;
URN: URN:SI:UM:
Vrsta dela (COBISS): Diplomsko delo/naloga
Komentar na gradivo: Univ. v Mariboru, Fak. za gradbeništvo, prometno inženirstvo in arhitekturo, Gradbeništvo
Strani: XI, 71 str.
ID: 10961894