diplomsko delo Visokošolskega strokovnega študijskega programa I. stopnje Strojništvo
Marcel Petrović (Avtor), Tomaž Berlec (Mentor), Drago Bračun (Komentor)

Povzetek

Zaradi zastojev pri operaciji montaže, prihaja do znižanja skupne učinkovitosti celotne avtomatizirane celice, katere del je obravnavana montažna priprava. Operacija vsebuje več kompleksnih postaj z veliko obrabljivimi deli, med njimi pa je tudi robotska manipulacija s kosi pri kateri pride do mehanskih poškodb na obdelanih mestih. Ker želimo odkriti vzroke za zastoje obstoječega procesa, smo izbrali metodo DMAIC, ki je del šest sigma metodologije. Ugotovimo, da sta glavna vzroka za zastoje nestandardizirani posegi v stroj ob okvari in s tem nepredvidene okvare pištole za kovičenje ter robotski naleti pri katerih pride do mehanskih poškodb, ki predstavljajo izmetne kose ter tako znižujejo faktor kakovosti. Najbolj zahteven in obremenjen del montažne priprave je pištola za kovičenje, ki je vzrok za 90 % zastojev na pripravi. Glavni izboljšavi v času diplomske naloge so izdelana navodila za montažo, demontažo, preventivni pregled in čiščenje pištole za kovičenje, ter zamenjano robotsko prijemalo, ki ne povzroča mehanskih poškodb na izdelkih.

Ključne besede

diplomske naloge;skupna učinkovitost;montažne priprave;sledljivost;mehanske poškodbe;standardizacija posegov;

Podatki

Jezik: Slovenski jezik
Leto izida:
Tipologija: 2.11 - Diplomsko delo
Organizacija: UL FS - Fakulteta za strojništvo
Založnik: [M. Petrović]
UDK: 658.515(043.2)
COBISS: 16708635 Povezava se bo odprla v novem oknu
Št. ogledov: 727
Št. prenosov: 146
Ocena: 0 (0 glasov)
Metapodatki: JSON JSON-RDF JSON-LD TURTLE N-TRIPLES XML RDFA MICRODATA DC-XML DC-RDF RDF

Ostali podatki

Sekundarni jezik: Angleški jezik
Sekundarni naslov: Improvement of assembling machine's overall equipment effectiveness
Sekundarni povzetek: Due to downtimes at the assembly operation it comes to the lowering of the overall equipment effectiveness by the complete automated robotic cell which is the part of the discussed assembling machine.The operation consists of more complex stations with many worn out parts, among them is also the robot manipulation with pieces where it comes to mechanical damage on the machined places. As we wanted to discover the reason for the downtimes by the existing process, we chose DMAIC which is a part of six sigma methodology. We established that the main reasons for the downtimes are nonstandardized interventions in the machine by its breakdown what results in the unexpected damage of the rivet gun and the robot collisions where it comes to mechanical damage followed by scrap-pieces that lower the quality. The most exacting and burdened part of the assembling machine is the rivet gun which is responsible for the 90 % of the machine downtimes. During the diploma work we made two main improvements: instructions for the assembly, dismantling, precautious check-up, rivet gun cleaning and the exchanged robot gripper that causes no mechanical damage of the products.
Sekundarne ključne besede: overall equipment effectiveness;assembling machines;traceability;mechanical damage;standardization of interventions;
Vrsta dela (COBISS): Diplomsko delo/naloga
Študijski program: 0
Konec prepovedi (OpenAIRE): 1970-01-01
Komentar na gradivo: Univ. v Ljubljani, Fak. za strojništvo
Strani: XXI, 55 str.
ID: 11162709
Priporočena dela:
, diplomsko delo Visokošolskega strokovnega študijskega programa I. stopnje Strojništvo
, magistrsko delo Organizacija in management poslovnih in delovnih sistemov
, diplomsko delo visokošolskega strokovnega študijskega programa
, diplomsko delo visokošolskega strokovnega študija Organizacija in management delovnih procesov