diplomsko delo
Peter Polak (Avtor), Matjaž P. Nekrep (Mentor), Janja Kramer Stajnko (Komentor)

Povzetek

V diplomskem delu je predstavljena sanacija cevovoda iz rezervoarja Šoštanj do revizijskega jaška na Levstikovi ulici v Šoštanju, kjer se cevovod razdeli na Termoelektrarno Šoštanj in na vodovod mesta Šoštanj. Zaradi starosti in dotrajanosti cevovoda je bila sanacija nujno potrebna, saj je bil cevovod zgrajen leta 1976. Stare dotrajane azbestno-cementne cevi so zamenjale nove plastične alkaten (PE-polietilen) cevi po metodi uvleka in vrivanja nove cevi v stare azbestno-cemente večjih dimenzij. V diplomskem delu je opisano obstoječe stanje odvodnega in dovodnega cevovoda pred sanacijo, projekt za izvedbo cevovoda, sama izvedba sanacije, materiali uporabljeni v projektu in končno stanje cevovoda po sanaciji v projektu izvedenih del. Prav tako so opisane spremembe med obstoječim stanjem jaška Termoelektrarne Šoštanj in končnim stanjem ter razlika med projektno dokumentacijo za izvedbo in projektno dokumentacijo izvedenih del.

Ključne besede

gradbeništvo;sanacija;cevovod;termoelektrarna;diplomske naloge;

Podatki

Jezik: Slovenski jezik
Leto izida:
Tipologija: 2.11 - Diplomsko delo
Organizacija: UM FGPA - Fakulteta za gradbeništvo, prometno inženirstvo in arhitekturo
Založnik: [P. Polak]
UDK: 628.14(043.2)
COBISS: 34368515 Povezava se bo odprla v novem oknu
Št. ogledov: 492
Št. prenosov: 45
Ocena: 0 (0 glasov)
Metapodatki: JSON JSON-RDF JSON-LD TURTLE N-TRIPLES XML RDFA MICRODATA DC-XML DC-RDF RDF

Ostali podatki

Sekundarni jezik: Angleški jezik
Sekundarni naslov: RENOVATION OF THE ŠOŠTANJ PIPELINE – THERMAL POWER PLANT ŠOŠTANJ
Sekundarni povzetek: The diploma thesis presents the rehabilitation of the pipeline from the Šoštanj reservoir to the inspection shaft on Levstikova ulica in Šoštanj, where the pipeline is divided into the Šoštanj Thermal Power Plant and the Šoštanj water supply system. Due to the age and dilapidation of the pipeline, rehabilitation was urgently needed as the pipeline was built in 1976. Old worn-out asbestos-cement pipes have been replaced by new plastic alkaten (PE-polyethylene) pipes using the method of drawing and inserting new pipes into old asbestos-cement pipes with larger dimensions. The diploma thesis describes the existing condition of the drain and supply pipeline before rehabilitation, the project for the implementation of the pipeline, the implementation of rehabilitation, materials used in the project, and the final condition of the pipeline after rehabilitation of the project. The changes between the existing condition of the shaft of the Šoštanj Thermal Power Plant and the final condition are also described, as well as the difference between the project documentation for the execution and the project documentation of the performed works.
Sekundarne ključne besede: construction;rehabilitation;pipeline;thermal power plant;
Vrsta dela (COBISS): Diplomsko delo/naloga
Komentar na gradivo: Univ. v Mariboru, Fak. za gradbeništvo, prometno inženirstvo in arhitekturo, Gradbeništvo
Strani: X, 30 f.
ID: 12029279
Priporočena dela:
, diplomska naloga univerzitetnega študijskega programa
, diplomska naloga univerzitetnega študijskega programa
, diplomsko delo visokošolskega strokovnega študija Organizacija in management kadrovskih in izobraževalnih procesov
, ni podatka o podnaslovu