magistrsko delo magistrskega študijskega programa II. stopnje Strojništvo
Tim Willenpart (Avtor), Tomaž Berlec (Mentor), Janez Kušar (Komentor)

Povzetek

V okviru magistrskega dela smo predstavili preventivno vzdrževanje pakirne linije, saj se farmacevtska podjetja soočajo z rastjo kapacitet proizvodnih procesov in imajo zaradi tega več zastojev in okvar. Razvili smo model optimizacije proizvodnje, ki je sestavljen iz treh faz. Prva faza je popis delovnega sredstva. Druga faza je skrb za delovno sredstvo, ki zajema 5S metodo in celotno dokumentacijo delovnega sredstva. Tretja faza se osredotoča na vzdrževanje delovnega sredstva. Za vsako komponento delovnega sredstva se izbere tip vzdrževanja in določi kritičnost nadomestnih delov. S pomočjo kritičnosti nadomestnih delov se določita sistem planiranja in zaloga nadomestnih delov. Uvedla se je metoda FMECA in sistem za določevanje kritičnosti na osnovi FMEA analize in TPM programa. Z opisanim modelom vzdrževanja nam je uspelo zmanjšati zastoje, okvare, zaloge nadomestnih delov v skladišču ter zmanjšati stroške proizvodnje na pakirni liniji v podjetju.

Ključne besede

magistrske naloge;pakirna linija;optimizacija;celostno produktivno vzdrževanje;analiza kritičnosti;FMECA analiza;

Podatki

Jezik: Slovenski jezik
Leto izida:
Tipologija: 2.09 - Magistrsko delo
Organizacija: UL FS - Fakulteta za strojništvo
Založnik: [T. Willenpart]
UDK: 658.527:005.935(043.2)
COBISS: 57197571 Povezava se bo odprla v novem oknu
Št. ogledov: 772
Št. prenosov: 166
Ocena: 0 (0 glasov)
Metapodatki: JSON JSON-RDF JSON-LD TURTLE N-TRIPLES XML RDFA MICRODATA DC-XML DC-RDF RDF

Ostali podatki

Sekundarni jezik: Angleški jezik
Sekundarni naslov: Preventive maintenance of the packaging line
Sekundarni povzetek: As part of the master's thesis, we presented the preventive mentainance of the packaging line, as pharmaceutical companies are facing an increase in the capacity of production processes and therefore have more congestion and breakdowns. We have developed a production optimization model consisting of three phases. The first phase is an inventory of the working asset. The second phase is the care of the working tool, which includes the 5S method and the entire documentation of the working tool. The third phase focuses on the maintenance of the working asset. For each component of the working medium, the type of maintenance is selected and the criticality of the spare parts is determined. The criticality of spare parts determines the planning system and the stock of spare parts. The FMECA method and the criticality determination system based on FMEA analysis and TPM program were introduced. With the described maintenance model, we managed to reduce congestion, breakdowns, stocks of spare parts in the warehouse and reduce production costs on the packaging line in the company.
Sekundarne ključne besede: master thesis;packing line;optimization;integrated productive maintenance;criticality analysis;FMECA analysis;
Vrsta dela (COBISS): Magistrsko delo/naloga
Študijski program: 0
Konec prepovedi (OpenAIRE): 1970-01-01
Komentar na gradivo: Univ. Ljubljana, Fak. za strojništvo
Strani: XXIV, 121 str.
ID: 12605187
Priporočena dela:
, magistrsko delo magistrskega študijskega programa II. stopnje Strojništvo
, magistrsko delo magistrskega študijskega programa II. stopnje Strojništvo
, diplomsko delo visokošolskega strokovnega študija Organizacija in management delovnih procesov