magistrsko delo magistrskega študijskega programa II. stopnje Strojništvo
Maja Jokić (Avtor), Tomaž Berlec (Mentor), Janez Kušar (Komentor)

Povzetek

V magistrskem delu smo na podlagi pregleda literature s področja planiranja proizvodnje in na podlagi analize obstoječega načina planiranja zasnovali nov način planiranja, ki vključuje predlog vpeljave normiranih proizvodnih časov v podjetju z maloserijsko proizvodnjo, pri kateri prevladujejo značilnosti individualne proizvodnje. Podjetje se ukvarja s proizvodnjo transformatorjev in vsako naročilo je obravnavano kot posamezen projekt. Planirane ure smo glede na zahteve podjetja določili na podlagi baze podatkov o porabljenem času pri preteklih izvedenih projektih ter na podlagi tehničnih podatkov, ki so znani že v zgodnji fazi projekta in smo jih uporabili kot izhodišče za mrežno planiranje z uporabo metode PERT. Iz rezultatov je vidno, da je novo predlagani sistem planiranja učinkovit in se realno približa dejanskemu času. Ker zajema komunikacijo s proizvodnim sektorjem, kontinuiran nadzor in sprotno izboljševanje, je to verodostojen sistem za planiranje normiranih proizvodnih časov.

Ključne besede

magistrske naloge;planiranje proizvodnje;individualna proizvodnja;predlog vpeljave;potek projekta;mrežno planiranje;metoda PERT;

Podatki

Jezik: Slovenski jezik
Leto izida:
Tipologija: 2.09 - Magistrsko delo
Organizacija: UL FS - Fakulteta za strojništvo
Založnik: [M. Jokić]
UDK: 658.531(043.2)
COBISS: 78043139 Povezava se bo odprla v novem oknu
Št. ogledov: 635
Št. prenosov: 70
Ocena: 0 (0 glasov)
Metapodatki: JSON JSON-RDF JSON-LD TURTLE N-TRIPLES XML RDFA MICRODATA DC-XML DC-RDF RDF

Ostali podatki

Sekundarni jezik: Angleški jezik
Sekundarni naslov: Individual and small batch production planning
Sekundarni povzetek: This Master's thesis introduces a new planning method that proposes implementation of standard production times for a company with small batch production dominated by features of individual production. The new planning method was based on a literature review in the field of production planning, as well as an analysis of the existing planning method. In a company specializing in the production of transformers, each order is considered an individual project. In accordance with the company's requirements, the planned hours were determined by utilizing a database of timelines for past completed projects, and technical data known at the early stage of the project. These technical data became the starting point for network planning using the PERT method. The results show that the newly proposed planning system is efficient and realistically close to actual time. By taking into consideration communication with the production sector, continuous monitoring and continuous improvement, the system proves to be reliable for planning standard production times.
Sekundarne ključne besede: master thesis;production planning;individual production;implementation proposal;project progress;network planning;PERT method;
Vrsta dela (COBISS): Magistrsko delo/naloga
Študijski program: 0
Konec prepovedi (OpenAIRE): 2022-08-27
Komentar na gradivo: Univ. Ljubljana, Fak. za strojništvo
Strani: XXII, 66 str.
ID: 13314315
Priporočena dela:
, magistrsko delo magistrskega študijskega programa II. stopnje Strojništvo
, magistrsko delo magistrskega študijskega programa II. stopnje Strojništvo