diplomsko delo
Nuša Šüklar (Avtor), Miran Brezočnik (Mentor), Boštjan Pinter (Komentor)

Povzetek

V diplomskem delu je prikazan predlog posodobitve planiranja montažnih linij za izdelavo modularnih bivalnih enot v podjetju Arcont d.d. s profesionalnim orodjem zunanjega ponudnika. Primerjali smo sedanji način dela s predlaganim. Podatke za primerjavo smo pridobili na osnovi eksperimenta. Zaradi uporabe testne verzije programa ni bilo možno uporabiti vseh njegovih funkcij. Iz tega razloga so uporabljene funkcije predstavljene na praktičnem primeru, ostale pa opisane teoretično. Prednosti in slabosti novega načina dela so prikazane v omejeni meri, kar trenutno še ne omogoča, da bi z gotovostjo trdili, da bo nov način planiranja bistveno boljši od dosedanjega.

Ključne besede

modularne bivalne enote;montaža;montažna linija;optimizacija;planiranje;diplomske naloge;

Podatki

Jezik: Slovenski jezik
Leto izida:
Tipologija: 2.11 - Diplomsko delo
Organizacija: UM FS - Fakulteta za strojništvo
Založnik: [N. Šüklar]
UDK: 658.513/.514(043.2)
COBISS: 103994883 Povezava se bo odprla v novem oknu
Št. ogledov: 231
Št. prenosov: 45
Ocena: 0 (0 glasov)
Metapodatki: JSON JSON-RDF JSON-LD TURTLE N-TRIPLES XML RDFA MICRODATA DC-XML DC-RDF RDF

Ostali podatki

Sekundarni jezik: Angleški jezik
Sekundarni naslov: Optimization of assembly lines planning for the production of modular buildings in the company Arcont d.d.
Sekundarni povzetek: This diploma work shows an upgrade proposal of the planning process for the production of modular buildings in the company Arcont d.d., with a professional tool from an outside provider. We compared the current way of working with the proposed one. Data for the comparison were obtained on the basis of an experiment. Due to the use of a test version of the program, it was not possible to use all of its features. For this reason, the functions used are presented on a practical example, and the rest are described theoretically. The advantages and disadvantages of the new way of working are shown to a limited extent, which currently does not allow us to say with certainty, that the new way of planning will be significantly better than the current one.
Sekundarne ključne besede: modular buildings;assembly;assembly line;optimization;planning;
Vrsta dela (COBISS): Diplomsko delo/naloga
Komentar na gradivo: Univ. v Mariboru, Fak. za strojništvo, Proizvodno strojništvo
Strani: VIII, 23 f.