magistrsko delo
Aljaž Rogl (Avtor), Miran Ulbin (Mentor), Aleš Hace (Mentor), Miloš Beković (Komentor), Krištof Zupanc (Komentor)

Povzetek

V zaključnem delu je predstavljen cevovod dopolnilne vode, ki oskrbuje sistem priprave goste mešanice s tehnološko vodo v termoelektrarni Nikola Tesla v Srbiji. Trenutno se na lokaciji deponije pojavljajo škodljive snovi, raztopljene v vodi, ki odteče pri usedanju redke mešanice. Cilj projekta je zamenjati predhodno redko mešanico z gosto, ki bo imela manjšo potrebo po vodi in prav tako manjši ekološki vpliv na lokaciji deponije. Obravnavani cevovod dopolnilne vode je eden izmed cevovodov, ki zagotavljajo tehnološko vodo iz vira ali prelivnega bazena v procese delovanja termoelektrarne. Naloga obravnavanega cevovoda je črpanje vode iz bagrske jame bloka A3 do skupnega bazena tehnološke vode. Za obravnavani cevovod so bile izvedene strukturno statične analize s programsko opremo CAESAR II. Cilj analiz je preveriti skladnost cevovoda s standardom SIST EN 13480 in potrebo po implementaciji kompenzatorjev ter pridobiti obremenitve na podpore cevovoda za potrebe nadaljnjih študij.

Ključne besede

termoelektrarna;priprava goste mešanice;statično strukturna analiza;kompenzator;obremenitve;magistrske naloge;

Podatki

Jezik: Slovenski jezik
Leto izida:
Tipologija: 2.09 - Magistrsko delo
Organizacija: UM FS - Fakulteta za strojništvo
Založnik: [A. Rogl]
UDK: 621.643.2.07(043.2)
COBISS: 215367939 Povezava se bo odprla v novem oknu
Št. ogledov: 0
Št. prenosov: 19
Ocena: 0 (0 glasov)
Metapodatki: JSON JSON-RDF JSON-LD TURTLE N-TRIPLES XML RDFA MICRODATA DC-XML DC-RDF RDF

Ostali podatki

Sekundarni jezik: Angleški jezik
Sekundarni naslov: Distribution pipeline design, analysis and control
Sekundarni povzetek: The master thesis presents the make-up water pipeline that supplies the thick mix preparation system with process water at the Nikola Tesla Thermal Power Plant in Serbia. Currently, the landfill site is subject to harmful substances dissolved in the water that flows from the settling of the lean slurry. The aim of the project is to replace the previous lean slurry with a dense slurry that will have a lower water demand and also a lower ecological impact on the landfill site. The make-up water pipeline under consideration is one of the pipelines that provide process water from the source or the common process water pool to the thermal power plant operation processes. The function of the pipeline under consideration is to pump water from the dredge pit of Unit A3 to the common process water pool. The objective of the analyses was to verify the compliance of the pipeline with the SIST EN 13480 standard, to verify the need for the implementation of expansion joints, and to obtain the loads on the pipeline supports for further studies.
Sekundarne ključne besede: Thermal power plant;dense slurry preparation;static structural analysis;compensator;support loads;
Vrsta dela (COBISS): Magistrsko delo/naloga
Konec prepovedi (OpenAIRE): 2027-09-01
Komentar na gradivo: Univ. v Mariboru, Fak. za strojništvo, Mehatronika
Strani: 1 spletni vir (1 datoteka PDF (XIII, 119 f.))
ID: 24872419
Priporočena dela:
, magistrsko delo magistrskega študijskega programa II. stopnje Strojništvo
, magistrsko delo magistrskega študijskega programa II. stopnje Strojništvo