diplomska naloga
Aleš Bedek (Avtor), Aleksander Srdič (Mentor), Drago Saje (Član komisije za zagovor)

Povzetek

Planiranje in vodenje projekta v gradbeništvu je zahtevno opravilo, saj je pri tem potrebno vnaprej natančno predvideti vsa potrebna dela, stroške in čas. Kvalitetno načrtovanje celotnega procesa in presoja bodočih stroškov sta sorazmerna s pravočasno in dobičkonosno izvedbo zadanega projekta. V diplomski nalogi je analizirano odstopanje stroškov in časa pri izgradnji oziroma rekonstrukciji mostu skupaj z ureditvijo regionalne ceste in rečne struge. Narejena je bila primerjava med pogodbenim predračunom in dejanskimi stroški izvajalca ter primerjava med pogodbenim terminskim planom in realnim potekom del. Podrobneje je opisan potek same izgradnje obravnavanega objekta, kot tudi razporeditev delovne sile in gradbene mehanizacije na gradbišču. Prav tako so natančneje obravnavane tudi spremembe v projektu, ki so doprinesle k časovnim zamikom med gradnjo in nepričakovanim stroškom.

Ključne besede

gradbeništvo;diplomska dela;VSŠ;OG-MO;mostovi;rekonstrukcija;terminski plan;stroški;analiza;odstopanja;

Podatki

Jezik: Slovenski jezik
Leto izida:
Tipologija: 2.11 - Diplomsko delo
Organizacija: UL FGG - Fakulteta za gradbeništvo in geodezijo
Založnik: [A. Bedek]
UDK: 005:69:624.21(043.2)
COBISS: 7173473 Povezava se bo odprla v novem oknu
Št. ogledov: 1932
Št. prenosov: 425
Ocena: 0 (0 glasov)
Metapodatki: JSON JSON-RDF JSON-LD TURTLE N-TRIPLES XML RDFA MICRODATA DC-XML DC-RDF RDF

Ostali podatki

Sekundarni jezik: Angleški jezik
Sekundarni naslov: Cost and time analysis of bridge construction project
Sekundarni povzetek: Planning and project management in civil engineering is a challenging task, because it is essential to closely predict all the required work, cost and time in advance. Quality process planning and the evaluation of future costs are proportional to profitably complete a set project in time. This graduation thesis analyzes the deviation of costs and time during the reconstruction of the bridge together with the arrangement of the regional road and the riverbed. Two comparisons were made; one between the contract pre-assessment of costs and the actual cost to the contractor, and one between the contract schedule and the actual progress of the work. The construction progress of the facility was described in detail, as well as the distribution of labor and construction machinery at the construction site. Changes in the project which contributed to unexpected costs and additional lag time during construction were also specifically described in the graduation thesis.
Sekundarne ključne besede: graduation thesis;civil engineering;bridges;reconstruction;time schedule;costs;analysis;deviations;
Vrsta datoteke: application/pdf
Vrsta dela (COBISS): Diplomsko delo/naloga
Komentar na gradivo: Univ. v Ljubljani, Fak. za gradbeništvo in geodezijo
Strani: XX, 42 str., 10 pril.
ID: 9055560