Vodne pregrade se od nekdaj gradijo zaradi koristi, vendar pa hkrati predstavljajo grožnjo
oziroma določeno tveganje za okolje in ljudi v njihovem vplivnem območju. Zato sta
zagotavljanje varnosti pregrad in poznavanje tveganja, ki ga pregrada predstavlja v prostoru,
eni izmed ključnih nalog v pregradnem inženirstvu. V okviru diplomske naloge je analizirana
varnost sistema pregrad Mavčiče-Medvode. Predstavljene so osnovne značilnosti
obravnavnih pregrad ter dokumentacija in sistemi, s katerimi se zagotavlja in spremlja
obratovalna varnost objektov. Na podlagi dokumentacije in terenskega ogleda je s pomočjo
metodologije projekta VODPREG opredeljena stopnja tveganja. Ocena tveganja dejansko ni
narejena strogo po definiciji, temveč temelji na vrednotenju bistvenih parametrov, s katerimi
najbolj povzamemo stopnjo nevarnosti, ki jo obravnavani sistem pregrad predstavlja za
okolico.
Ključne besede
gradbeništvo;diplomska naloga;UNI;VOI;pregrade;HE Mavčiče;HE Medvode;ocena tveganja;analiza varnosti;tehnično opazovanje;VODPREG;klasifikacija pregrad;
Podatki
Jezik: |
Slovenski jezik |
Leto izida: |
2015 |
Tipologija: |
2.11 - Diplomsko delo |
Organizacija: |
UL FGG - Fakulteta za gradbeništvo in geodezijo |
Založnik: |
[M. Tallarini] |
UDK: |
627.82(497.4)(043.2) |
COBISS: |
7287393
|
Št. ogledov: |
3608 |
Št. prenosov: |
552 |
Ocena: |
0 (0 glasov) |
Metapodatki: |
|
Ostali podatki
Sekundarni jezik: |
Angleški jezik |
Sekundarni naslov: |
Safety Analysis of the Mavčiče-Medvode dam cascade |
Sekundarni povzetek: |
Dams have always been built because of the benefits they offer, however, they are a threat
to the environment and the people living nearby. To this end, ensuring the safety of dams
and being aware of the risks they pose to the environment are two of the main tasks of dam
engineering. As part of the thesis, we analysed the safety of the Mavčiče-Medvode dam
cascade. The thesis presents the main characteristics of the dams and deals with the
documentation and systems ensuring and monitoring their operational safety. Based on the
documentation and field inspection, the level of risk was determined using the methodology
of the VODPREG project. The risk assessment was not performed in strict accordance with
the definition, but rather by assessing the key parameters that accurately represent the level
of risk the dam poses to its vicinity. |
Sekundarne ključne besede: |
graduation thesis;dams;hydroeletric power plant Mavčiče;hydroelectric power plant Medvode;risk evaluation;safety systems;tehnical observation;VODPREG; |
Vrsta datoteke: |
application/pdf |
Vrsta dela (COBISS): |
Diplomsko delo/naloga |
Komentar na gradivo: |
Univ. v Ljubljani, Fak. za gradbeništvo in geodezijo |
Strani: |
X, 50 str. |
ID: |
9056492 |