diplomska naloga
Povzetek
Graditev objektov je proces, ki zajema več med seboj povezanih dejavnosti. Osnovni cilj gradbenega podjetja je, da gradbeni projekt izvede kvalitetno s čim nižjimi stroški in v najkrajšem možnem času. Zato je pomembna priprava, kjer se predvidijo vsi stroški in čas dela, ter sprotna kontrola in ukrepanja med samo gradnjo. V diplomski nalogi je podrobno opisan potek izgradnje hleva in pogodbena dokumentacija. Analizirano je odstopanje stroškov in časa pri gradnji hleva, na podlagi primerjave med pogodbenim predračunom in končnim obračunom ter na podlagi primerjave med pogodbenim terminskim planom in dejanskim potekom del. V preglednicah so predstavljena natančna stroškovna odstopanja glede na vrsto del. Podrobno so opisani tudi razlogi za nastale zamude in stroškovna odstopanja.
Ključne besede
gradbeništvo;diplomska naloga;OG-MO;izgradnja;terminski plan;analiza;stroški;odstopanja;
Podatki
Jezik: |
Slovenski jezik |
Leto izida: |
2016 |
Tipologija: |
2.11 - Diplomsko delo |
Organizacija: |
UL FGG - Fakulteta za gradbeništvo in geodezijo |
Založnik: |
[T. Balek] |
UDK: |
005.521:631.223:69.01(043.2) |
COBISS: |
7861089
|
Št. ogledov: |
1977 |
Št. prenosov: |
561 |
Ocena: |
0 (0 glasov) |
Metapodatki: |
|
Ostali podatki
Sekundarni jezik: |
Angleški jezik |
Sekundarni naslov: |
Cost and time analysis of the construction of agricultural barn |
Sekundarni povzetek: |
Building construction is a process that includes several interrelated activities. The basic goals of the construction company are to complete a project at the lowest cost and in the shortest possible time. Therefore it is important to prepare and predict all the costs and labor time, and execute controls and actions during construction. This graduation thesis describes the construction of a barn in detail and all the contract documents. It analyzes the deviation of cost and time in building a barn, on basis of a comparison between the contract pre-assessment of costs and the actual cost to the contractor, and comparison between the contract schedule and the actual progress of the work. The tables in the graduation thesis present detailed cost deviations. A description of the reasons for the delays and cost deviations is also included in the graduation thesis. |
Sekundarne ključne besede: |
construction;time schedule;analysis;costs;deviations; |
Vrsta datoteke: |
application/pdf |
Vrsta dela (COBISS): |
Diplomsko delo/naloga |
Komentar na gradivo: |
Univ. v Ljubljani, Fak. za gradbeništvo in geodezijo |
Strani: |
XVI, 43 str., [7] str. pril. |
ID: |
9240559 |