magistrsko delo
Povzetek
Namen magistrskega dela je predstaviti teoretične okvirje in pravilnike za področje vodenja in zavarovanja prometa v času gradnje in za postavitev cestnih zapor. Predstavili smo slovensko zakonodajo na področju cestnih zapor pa tudi primere iz tujine ter evropsko regulativo. Opisali smo programe, ki so se uporabljali za izdelavo elaborata. V praktičnem delu smo predstavili izdelavo zahtevnejšega elaborata vodenja in zavarovanja prometa v času gradnje na primeru protipoplavne ureditve Selške Sore. Elaborat služi za pridobitev stroškovne ocene in za preveritev izvedbe gradnje. Obravnavi projekt je bil v času pisanja magistrske naloge že v izvajanju, zato smo lahko primerjali izdelano projektno dokumentacijo z izvedenim stanjem na terenu- Prikazali smo tudi fotografije s terena v času izvedbe gradbenih del. Ugotovljeno je bilo, da se sama izvedba zapore na terenu razlikuje od predvidene v izdelanem elaboratu.
Ključne besede
zapore cest;urejanje prometa v času gradnje;tipske sheme zapor;izdelava elaborata;
Podatki
| Jezik: |
Slovenski jezik |
| Leto izida: |
2024 |
| Tipologija: |
2.09 - Magistrsko delo |
| Organizacija: |
UM FGPA - Fakulteta za gradbeništvo, prometno inženirstvo in arhitekturo |
| Založnik: |
[M. Bašadur] |
| UDK: |
656.11.053.8(043.2) |
| COBISS: |
210835459
|
| Št. ogledov: |
75 |
| Št. prenosov: |
16 |
| Ocena: |
0 (0 glasov) |
| Metapodatki: |
|
Ostali podatki
| Sekundarni jezik: |
Angleški jezik |
| Sekundarni naslov: |
Development of complex traffic management and protection report during construction: the case of flood regulation of Selška Sora |
| Sekundarni povzetek: |
The purpose of this master's thesis is to present theoretical frameworks and regulations for traffic management and safety during construction and the establishment of road closures. We presented Slovenian legislation on road closures as well as examples from European regulations. We described the software used to create the traffic management plan. In the practical part, we presented the development of a more complex traffic management and safety plan during construction, using the example of the flood protection project on the Selška Sora River. The plan serves to obtain a cost estimate and to verify the feasibility of the construction. The project was already underway at the time of writing the thesis, allowing us to compare the prepared project documentation with the actual conditions on-site. We also included photographs from the site taken during the construction work. It was found that the actual implementation of the road closure on-site differs from what was planned in the prepared traffic management plan. |
| Sekundarne ključne besede: |
elaboration;managing and securing traffic during construction;traffic closure;typical schemes of traffic closures; |
| Vrsta dela (COBISS): |
Magistrsko delo/naloga |
| Komentar na gradivo: |
Univ. v Mariboru, Fak. za gradbeništvo, prometno inženirstvo in arhitekturo, Prometno inženirstvo |
| Strani: |
1 spletni vir (1 datoteka PDF (X, 66 str.)) |
| ID: |
24779094 |