magistrsko delo
Pavel Janko (Author), Andrej Kryžanowski (Mentor), Primož Banovec (Thesis defence commission member), Igor Čuš (Co-mentor)

Abstract

Magistrsko delo obravnava področje hidroenergetike. Izdelana je variantna analiza možnosti izrabe energetskega potenciala na reki Muri, in sicer med hidroelektrarno Špilje in Sladkim vrhom. V magistrskem delu se primerja tri najperspektivnejše lokacije za izgradnjo hidroelektrarne. Prva je na lokaciji že obstoječe male hidroelektrarne Ceršak. Druga je na sotočju Mure in odvodnega kanala male hidroelektrarne Ceršak. Tretja lokacija je pred naseljem Sladki vrh. Vse tri lokacije zaradi preglednosti poimenujem varianta 1, 2 in 3. Vse tri elektrarne so si po zasnovi podobne, razlikujejo se po izkoristljivem padcu in potrebni izgradnji energetskih nasipov. V zaključku je izbrana tista elektrarna, katere ekonomski kazalci so najboljši.

Keywords

gradbeništvo;magistrska dela;II. VOI;hidroelektrarne;hidroelektrarne na Muri;Mura;hidrotehnika;energetski potencial;nasipi;

Data

Language: Slovenian
Year of publishing:
Typology: 2.09 - Master's Thesis
Organization: UL FGG - Faculty of Civil and Geodetic Engineering
Publisher: [P. Janko]
UDC: 627.8.09(282.24)(043.3)
COBISS: 8395873 Link will open in a new window
Views: 1290
Downloads: 2494
Average score: 0 (0 votes)
Metadata: JSON JSON-RDF JSON-LD TURTLE N-TRIPLES XML RDFA MICRODATA DC-XML DC-RDF RDF

Other data

Secondary language: English
Secondary title: Variant analysis of the hydro potential use on the border Mura river
Secondary abstract: This thesis addresses the field of hydro energetics. A variant analysis of possibilities of the hydro potential use on the Mura river between the area Špilje and the area Sladki vrh hydroelectric power plant is carried out. Three of the most promising locations are compared in the thesis. The first one is the location of the existing little Ceršak hydroelectric power plant. The second one is at the confluence of the Mura river and the drain canal of the little Ceršak hydroelectric power plant. The third location is before the Sladki vrh settlement. The hydroelectric power plant whose economic indicators are the best is chosen in the conclusion.
Secondary keywords: civil engineering;master thesis;hydro power plant;hydrotechnics;hydropower;dams;Mura river;
Type (COBISS): Master's thesis/paper
Study programme: 0
Embargo end date (OpenAIRE): 1970-01-01
Thesis comment: Univ. v Ljubljani, Fak. za gradbeništvo in geodezijo
Pages: XX, 83 str., 4 pril.
ID: 10927459